Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T05BU00812

Parcel: 14117012B

Inspection Status: Approved

Inspection History: LANDSCAPE INSPECTION

Permit Number - T05BU00812

Inspection Description - LANDSCAPE INSPECTION

Inspection Status - Approved

Date Description Inspector Results Comments
02/09/2017 LANDSCAPE INSPECTION Approved
06/16/2009 LANDSCAPE INSPECTION Denied According to approved tentative plat Case # S04-170 the following items need to be addressed prior to landscape final approval:

1. On-site monitoring of all aspects of site clearing, grading, plant protection, preservation, salvage, and mitigation shall be provided during project construction at the expense of the developer for all residential development that is over five (5) acres The monitoring shall be performed by an individual who is qualified in arid lands native plant resource identification and protection as specified in LUC 3.8.4. Monitoring report is required as to the disposition of preserved or transplanted protected native plants.

2. All required landscaping, irrigation systems, walls, screening devices, curbing, and detention basin landscape improvements on the site or within the abutting right-of-way shall be maintained as shown on the approved plans. The property owner is responsible for proper maintenance to achieve permanent, safe, and successful landscaping as required by this Division. Failure to maintain the improvements or landscaping required by this Division constitutes a violation per LUC 3.7.6 Perimeter buffers have not been maintained appropriately and appear to missing required plants. Note: Irrigation system needs may need repair or adjusting over-watering was observed.