Inspection Status: Approved
Inspection History: GRADING - TIER REV
| Date |
Description |
Inspector |
Results |
Comments |
| 04/20/2012 |
GRADING - TIER REV |
|
Approved |
Detail provided for Bldg 1 showing general locations of 2 drain pipes added. Engineering accepts the EOR's detail showing the locations of area drains for bldg 1, as a Tier 1 Grading Revision for drainage, that can be shown on as-builts at a later date. |
| 02/15/2012 |
GRADING - TIER REV |
|
Continued |
There is a revision to frontage sidewalk to be process as a Tier 1 revision. Stantec will be getting PDSD Engineering a detail that the Engr reviewer will check and then pass the detail to Inspector for inspection purposes. STANTEC will also show the change on the as-builts later. Frontage sidewalk will now be located only on west portion of frontage, with: curb, curb returns, ramps, curb transitions, & min 2-ft shy space. TDOT was concerned when contractor had approached them recently for ROW Use Permit since proposed sidewalk may have excessive longitudinal slope grades along eastern portion. Sidewalk was originally approved on plans with a DSMR for excluding far east section of sidewalk due to City Engineer's concerns for sidewalk in the wash. |