| 05/30/2013 |
GRADING - INTERMEDIATE |
|
Approved |
|
| 11/08/2012 |
GRADING - INTERMEDIATE |
|
Continued |
ROCK- RIP-RAP IS GROUTED PER AS-BUILTS. |
| 10/24/2012 |
GRADING - INTERMEDIATE |
|
Continued |
DRAINAGE ON EAST SIDE OF SITE TOE-DOWNS HAVE BEEN INSTALLED. |
| 09/21/2012 |
GRADING - INTERMEDIATE |
|
Continued |
NO CHANGE FROM LAST INSPECTION. |
| 09/13/2012 |
GRADING - INTERMEDIATE |
|
Continued |
NO CHANGE FROM LAST INSPECTION. |
| 09/07/2012 |
GRADING - INTERMEDIATE |
|
Continued |
RIP RAP HAS BEEN ADDED TO SOUTH SIDE OF SITE. |
| 08/30/2012 |
GRADING - INTERMEDIATE |
|
Continued |
MET AT SITE WITH ENGINEER WENT OVER PUNCH LIST. |
| 08/23/2012 |
GRADING - INTERMEDIATE |
|
Continued |
NO CHANGE FROM LAST INSPECTION. |
| 07/20/2012 |
GRADING - INTERMEDIATE |
|
Continued |
WORKING ON STRIPING AND LANDSCAPING ON NORTH SIDE OF BUILDING . |
| 06/25/2012 |
GRADING - INTERMEDIATE |
|
Continued |
PROVIDE AP AS-BUILTS BY COT FOR INSPECTION. |
| 05/23/2012 |
GRADING - INTERMEDIATE |
|
Continued |
GOT WITH CLAY WALKED JOB SITE NO CONCERNS AT THIS TIME. |
| 05/17/2012 |
GRADING - INTERMEDIATE |
|
Continued |
WORKING ON GRADING THE THE PARKING AREA ON NORTH SIDE OF BUILDING #8. |
| 04/12/2012 |
GRADING - INTERMEDIATE |
|
Continued |
WALKED JOB WITH DAVE AND CLAY WENT OVER WHAT NEEDS TO BE COMPLET FOR FRIDAY INSCPECTION. |
| 04/12/2012 |
GRADING - INTERMEDIATE |
|
Continued |
|
| 04/04/2012 |
GRADING - INTERMEDIATE |
|
Continued |
WORKING ON SIDE WALK AND DRAINAGE ON SOUTH SIDE OF SITE. |
| 03/27/2012 |
GRADING - INTERMEDIATE |
|
Continued |
GOT WITH CLAY ABOUT ADA RAMPS. |
| 03/26/2012 |
GRADING - INTERMEDIATE |
|
Continued |
CLAY GAVE ME PROPOSED PHASING PLAN. I DROPED OFF ONE FOR ELIZABETH TO LOOK OVER. |
| 03/19/2012 |
GRADING - INTERMEDIATE |
|
Continued |
HAD MEETING WITH ENGINEER. AND GOT WITH JOHN ABOUT SWPPP REPAIRS. |
| 03/13/2012 |
GRADING - INTERMEDIATE |
|
Continued |
WORKING ON FINAL GRADING FOR PAVING ONSOUTH SIDE OF SITE. |
| 03/12/2012 |
GRADING - INTERMEDIATE |
|
Continued |
WALK THRU WITH CLAY AND DAVE FOR AREA AROUND BUILDINGS THAT THEY WHAT COFO. |
| 03/09/2012 |
GRADING - INTERMEDIATE |
|
Continued |
MET WITH CLAY TO SEE WHAT HE NEEDS TO DO TO GET C OF O FOR CLUB HOUSE AND BUILDING #1. |
| 03/01/2012 |
GRADING - INTERMEDIATE |
|
Continued |
INSTALLING CURBING AND GRADING WORK. |
| 02/28/2012 |
GRADING - INTERMEDIATE |
|
Continued |
GAVE ELIZABETH RIDE OUT TO SITE TO MEET WITH LAURA WITH SANTEC. ABOUT RIGHT A WAY SIDE WALK AND CUBE. |
| 02/22/2012 |
GRADING - INTERMEDIATE |
|
Continued |
STARTED GRADING ON SOUTH SIDE OF BULIDING . |
| 02/07/2012 |
GRADING - INTERMEDIATE |
|
Continued |
NO TRACK OUT . WORKING ON GRADING. |
| 01/31/2012 |
GRADING - INTERMEDIATE |
|
Continued |
THEY GOT WATER TO SLOW DOWN THAT WAS GOING THUR STORM DRAIN PIPING . STILL NEED TO CLEAN WASHOUT . |
| 01/30/2012 |
GRADING - INTERMEDIATE |
|
Continued |
NEED TO REPAIR ALL CONTROLS FOR SWPPP AND WASH OUT. |
| 01/23/2012 |
GRADING - INTERMEDIATE |
|
Continued |
GOT WITH CONTRACTOR TO ADD ROCK TO ENTRANCE AND WE PULLED MEASUREMENTS ON THE TRASH ENCLOSURES. |
| 01/19/2012 |
GRADING - INTERMEDIATE |
|
Continued |
STARTED GRADING ROAD ON SOUTH EAST SIDE OF JOB SITE. |
| 01/11/2012 |
GRADING - INTERMEDIATE |
|
Continued |
NO CONCERNS AT THIS TIME. |
| 12/23/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO CONCERNS AT THIS TIME. |
| 11/10/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO CONCERNS AT THIS TIME. |
| 11/08/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO GRADING ACTIVITY AT THIS TIME. |
| 11/04/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO CONCERNS AT THIS TIME. |
| 11/03/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO CONCERNS AT THIS TIME. |
| 11/01/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO GRADING IN OR IN FILL NO TRACK OUT AT THIS THIS TIME. |
| 10/28/2011 |
GRADING - INTERMEDIATE |
|
Continued |
ROCK HAS BEEN INSTALLED ON SITE FOR TRACK OUT. |
| 10/26/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NEEDS TO ADD ROCK TO ENTRANCE. TRACK OUT ON STREET FROM INFILL TRUCK INFILL ON EAST SIDE OF JOB SITE. |
| 10/21/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NPPO OK AT THIS TIME. NEEDS CLEAN TRACK OUT. |
| 10/20/2011 |
GRADING - INTERMEDIATE |
|
Continued |
GOT WITH COL ABOUT SWPPP CONTROL REPAIRS AND TO PROTECTION FOR PIP TREE FOR NPPO. |
| 10/18/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO CONCERNS AT THIS TIME. |
| 10/05/2011 |
GRADING - INTERMEDIATE |
|
Continued |
HAS NOT POSTED SWPPP INFO YET. |
| 09/27/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO CONCERNS AT THIS TIME. |
| 09/26/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO CONCERNS. |
| 09/23/2011 |
GRADING - INTERMEDIATE |
|
Continued |
INSTALLING SITE WATER AND SITE SEWER PER HIGHLIGHT ON AP PLANS. |
| 09/22/2011 |
GRADING - INTERMEDIATE |
|
Continued |
INSTALLING SITE WATER PIPING AT THIS TIME. |
| 09/13/2011 |
GRADING - INTERMEDIATE |
|
Continued |
WORKING ON SITE WATER AND SEWER. |
| 09/01/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO GRADING WORK AT THIS TIME. |
| 08/30/2011 |
GRADING - INTERMEDIATE |
|
Continued |
SITE SEWER WORK AND ON PADS TODAY. |
| 08/29/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO GARDING WORK TODAY. |
| 08/29/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO GRADING WORK AT THIS TIME. |
| 08/25/2011 |
GRADING - INTERMEDIATE |
|
Continued |
O'LEARY STARTING TO WORK ON SITE SEWER. |
| 08/24/2011 |
GRADING - INTERMEDIATE |
|
Continued |
JOHN GOT WITH ME ABOUT GRADING LIMITS TO GET TO HIS SITE SEWER AND MAN HOLE. |
| 08/18/2011 |
GRADING - INTERMEDIATE |
|
Continued |
WORKING ON ROCK WALL ON GRADING WORK AT THIS TIME. |
| 08/17/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO GRADING ACTIVITY AT THIS TIME. |
| 08/16/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO GRADING ACTIVITY TODAY |
| 08/15/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO GRADING ACTIVITY AT THIS TIME REPAIR TO SWPP NOT DONE YET. |
| 08/10/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO GRADING ACTIVITY TODAY. |
| 08/09/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO GRADING ACTIVITY AT THIS TIME. |
| 08/04/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO GRADING WORK AT THIS TIME TODAY. |
| 07/28/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO CONCERNS AT THIS TIME. |
| 07/27/2011 |
GRADING - INTERMEDIATE |
|
Continued |
MOVING DRIT OFF SITE STREETS LOOK OK AT THIS TIME. |
| 07/15/2011 |
GRADING - INTERMEDIATE |
|
Continued |
GRADING ACTIVITY ON GOING .NO CONCERNS AT THIS TIME. |
| 07/14/2011 |
GRADING - INTERMEDIATE |
|
Continued |
WORKING ON THE LAST OF NPPO AND STARTING GRADING. |
| 07/06/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO ACTIVITY TO DAY. WATER TANK INSTALLED . |
| 06/30/2011 |
GRADING - INTERMEDIATE |
|
Continued |
NO ACTIVITY ON SITE TODAY .THEY HAVE BEEN WORKING ON NPPO NURSERY. |