Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date |
Description |
Inspector |
Results |
Comments |
| 05/30/2013 |
STORMWATER INSTALL OF CONTROLS |
|
Approved |
|
| 10/17/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
FORMING FOR STORM DRAINS CATCH BASIN . AND GRADING ON EAST SIDE OF SITE. |
| 09/21/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
HIGHLIGHTED AP PLANS NOT ON SITE FOR STORM DRAIN. THEY ARE INSALLING STORM DRAIN PIPING ON NOTH SIDE OF BUILDING #10. |
| 09/20/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Closed |
PROVIDE LETTER FOR CHANGE IN STORM PIPING FROM RCP TO SRP . THE SRP THAT IS INSTALLED IS PER HIGHLIGHT. |
| 09/19/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
INSPECTION FOR STORMWATER PIPING PER HIGHLIGHT ON PAGE C-8. PROVE LETTER FROM ENGINEER FOR PIPING TYPE. |
| 09/16/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
STORM DRAIN PIPING INSTALLED IS NOT PER AP PLAN PAGE C-8 THAT CALLS FOR RCP NAD PROFILE ON C-16 CALLS FOR SRP POVIDE STAMPED LETTER FROM ENGINEER FOR TYPE OF PIPE TO INSTALL. |
| 07/13/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
SWPPP CONTOLS INSTALLED. STOP WORK ORDER REMOVED. |
| 07/11/2011 |
STORMWATER INSTALL OF CONTROLS |
|
Continued |
INSTALLING SWPPP CONTROLS. |