Permit: T05BU00763

Inspection Status: Approved

Inspection History: ENGINEERING PRE-CONSTRUCTION

Date Description Inspector Results Comments
01/12/2006 ENGINEERING PRE-CONSTRUCTION Approved MET WITH AMERICAN ASPHALT AND GRADING
SCOTT 609-4349
OLIVER 260-0507
ERNESTO 260-0203
BRIAN

OUTLINED PRECON FORM (ON FILE)
-DOCUMENTS ON SITE DURING CONSTRUCTION
-ALL DRAINAGE STRUCTURES MUST BE INSPECTED BEFORE BEING POURED
-EROSION CONTROLS MUST BE IN PLACE BEFORE GRADING
-CLEARING/GRADING LIMITS MUST BE MARKED
-CONCRETE WASHOUT MUST BE MARKED
-CONTROL TRACKING ONTO ESCALANTE
-BASIN MUST BE CERTIFIED BY AN ENGINEER BEFORE RELEASE OF ASSURANCES