Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/28/2005 | STORMWATER INSTALL OF CONTROLS | Approved | 1) ENSURE SEDIMENT CONTROLS ARE MAINTAINED PERIODICALLY AND DOCUMENT IT. 2) CONTINUE TO SWEEP UP ANY TRACKING OF MATERIAL ON PUBLIC ROADWAYS. 3) ESTABLISH A DESIGNATED CONCRETE WASH OUT AREA PRIOR TO POURING OF SIDEWALKS AND FOUNDATIONS. |
|
| 09/16/2005 | STORMWATER INSTALL OF CONTROLS | Partial Approval | SITE HAS RET/DET BASIN ROUGHED-IN, AND TWO STABILIZED CONSTRUCTION ENTRANCES. 1) INSTALL SDIMENT CONTROLS ALONG THE WEST PERIMETER, IAW YOUR SWPPP. 2) ENSURE PERIODIC SW MAINTENANCE INSPECTIONS ARE ACCOMPLISHED IAW SWPPP AND ARE DOCUMENTED. 3) ATTACH A COPY OF YOUR NOI TO YOUR SWPPP ON SITE. 4) ENSURE ANY TRACKED MATERIAL IS SWEPT UP OFF PUBLIC ROADWAYS. |