Permit: T05BU00673
Inspection Status: Correction Required
Inspection History: GRADING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2007 | GRADING - INTERMEDIATE | Correction Required | DUE TO THE FACT THAT THE SITE IS STILL UNDER CONSTRUCTION (TOWNHOMES ONLY) AND WORK IS BEING DONE ON EACH LOT, SILT HAS ERODED INTO DRAINAGE WAYS AND BASINS. PROIOR TO FINAL GRADING APPROVAL, ALL DRAINAGE WAYS AND BASINS MUST HAVE SILT REMOVE TO ALLOW FOR PROPER PERC OF STORM WATER. | |
| 03/14/2007 | GRADING - INTERMEDIATE | Not ready for Inspection | BASINS RUFFED-IN AND BEING USED FOR SEDIEMNT TRAPS ON SITE. PAVING NEXT WEEK | |
| 03/09/2007 | GRADING - INTERMEDIATE | Not ready for Inspection | SEE COMMENTS ENTERED 9/27/2006 AND 2/8/2007. | |
| 09/27/2006 | GRADING - INTERMEDIATE | Not ready for Inspection | 1) COMPLETE RET/DET BASIN AT SOUTH AND SOUTHWEST SIDE OF SITE. 2) REPAIR EROSION DAMAGE AT WALL OPENINGS AND DRAINAGE CHANNELS. 3) COMPLETE RIP RAP AT SOUTH SIDE IN BASIN. 4) CLARIFY REASON FOR LARGE WALL OPENING AT SOUTH SIDE RETAINING WALL. 5) COMPLETE ROCK WORK AT BASIN ON NE SIDE, PROVIDE GROUTED RIP RAP AT 1 TO 1 SLOPE ALONG EAST SLOPE ON NE CORNER OF SITE. 6) PROVIDE REVISED PLAN OR AS BUILT TO SHOW ANY CHANGES MADE TO NEW CATCH BASIN AT NORTH EAST END OF SITE AND ACROSS LIMBERLOST. 7) PROVIDE CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE RET/DET BASINS ON SITE WERE BUILT IN ACCORDANCE WITH THE APPROVED PLANS. 8) FINALIZE YOUR STORM WATER REQUIREMENT AND/OR STABILIZE 100% OF SITE. |