Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T05BU00533
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/30/2006 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
09/13/2006 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | 1) SEDIMENT CONTROLS HAVE BEEN RE-ESTABLISHED AROUND THE PERIMETER OF THE SITE AND AROUND THE EXISTING CATCH BASIN IN PARKING AREA. 2) A SIGNED COPY OF THE NOI HAS BEEN POSTED. 3) STORM WATER SELF INSPECTIONS HAVE BEEN PERFORMED AND DOCUMENTED. 4) ENSURE A DESIGNATED CONCRETE WASH OUT IS ESTABLISHED AND USED. 5) ENSURE TRACKED MATERIAL IS SWEPT UP ON A ROUTINE BASIS. 6) CONTINUE TO PERFORM STORM WATER SELF INSPECTIONS PER YOUR PLAN. |
|
09/06/2005 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
08/19/2005 | ENGINEERING PRE-CONSTRUCTION | Correction Required | 1) INSTALL SEDIMENT CONTROLS AS SHOWN ON YOUR APPROVED SWPPP. ANY CHANGES TO THE PLAN MUST BE SHOWN AND APPROVED BY THE INSPECTOR ASSIGNED TO THE PROJECT. 2) INSTALL A STBILIZED CONSTRUCTION ENTRANCE PER YOUR SWPPP. 3) POST A COPY OF YOUR AZPDES AUTHORIZATION NUMBER AT THE ENTRANCE TO THE SITE. 4) PERFORM PERIODIC STORM WATER MAINTENANCE INSPECTIONS AND DOCUMENT THEM IN ACCORDANCE WITH YOUR SWPPP. 5) SWEEP UP ANY TRACKING OF SOIL OFF SITE. 6) PROTECT THE ADJACENT CATCH BASIN FROM SILT USING SEDIMENT CONTROLS. CALL FOR RE-INSPECTION WHEN CORRECTIONS HAVE BEEN MADE. |