Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T05BU00469

Parcel: 133330150


Addresses:

9120 E ROSEWOOD ST


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T05BU00469

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
10/02/2012 STORMWATER FOLLOW-UP INSP Approved NO CONCERNS AT THIS TIME.
07/05/2012 STORMWATER FOLLOW-UP INSP Continued NO CONCERNS AT THIS TIME.
05/23/2012 STORMWATER FOLLOW-UP INSP Continued NO CONCERNS AT THIS TIME.
04/19/2012 STORMWATER FOLLOW-UP INSP Continued NO CONCERNS AT THIS TIME.
03/29/2012 STORMWATER FOLLOW-UP INSP Continued NO CONCERNS AT THIS TIME.
02/06/2012 STORMWATER FOLLOW-UP INSP Continued NO CONCERNS AT THIS TIME.
07/01/2011 STORMWATER FOLLOW-UP INSP Continued NO CONCERNS AT THIS TIME.
06/14/2007 STORMWATER FOLLOW-UP INSP Correction Required SILT FENCE NEEDS MAINTENANCE
06/07/2007 STORMWATER FOLLOW-UP INSP Correction Required SILT FENCE AT NORTH AND WEST PERIMETERS NEEDS REPAIR.

ERIC CHENEY - (520) 820-6376 Cell (520) 615-6366 Office
02/27/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO SW CONCERNS
02/14/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS
STREET GRADING IS IN PROGRESS
01/29/2007 STORMWATER FOLLOW-UP INSP Partial Approval STREET GRADING IS IN PROGRESS
01/11/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS
SITE IS READY FOR PAVING. NO HOME CONSTRUCTION AT THIS TIME.
12/12/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE GRADING IS COMPLETE, DRAINAGE IMPROVEMENTS ARE ALMOST COMPLETE.
NEED BARRICADE RAILING, RIPRAP AND SCUPPERS.
CURBING IS IN PLACE
09/21/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS.
SITE GRADING IS COMPLETE, DRAINAGE IMPROVEMENTS ARE ALMOST COMPLETE.
NEED BARRICADE RAILING, RIPRAP AND SCUPPERS.
08/28/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS, STREET HAS BEEN SWEPT.
08/23/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTIONS HAVE NOT BEEN MADE, STORMWATER FOLLOW-UP INSPECTION IS NOT DUE UNTIL 8-25-06.
08/18/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. SWEEP DIRT TRACKED FROM SITE.
2. CALL FOR INTERMEDIATE GRADING INSPECTION (419-2466)
08/07/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. MAINTAIN STABILIZED CONSTRUCTION ENTRANCE.
2. REPAIR DOWNED SILT FENCE.
3. RE-ESTABLISH STRAW BALES AT WEST PERIMETER.
4. PROVIDE SEDIMENT AND EROSION CONTROL FOR DIRT SPOIL IN RIGHT OF WAY AT THE SW GAS CONNECTION.
06/07/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS
PIA STORM DRAINAGE SYSTEM THROUGH SITE IS UNDER CONSTRUCION 50% COMPLETE