Permit: T05BU00350


Addresses:

687 S BONANZA AV


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T05BU00350

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
05/23/2007 STORMWATER FOLLOW-UP INSP Approved
10/12/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 5 DAYS
-SWEEP STREET 9977 AND 9924 CALDERA, REMOVE DEBRIS IN ROADWAY
-LOT 28 DEBRIS IN ROADWAY
-CLEAN UP DEBRIS AND SWEEP 9927 KARST, LOT 12, LOT 10, LOT 7
-CLEAN UP PAINT WASHOUT 9978 KARST
10/04/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 5 DAYS
-DRYWALL WASHED OUT ON LOT 20
-LOT 24 PAINT WASHED OUT ON LOT
-LOT 26 STUCCO MIXER NO BMPS
-9923 KARST UNCONTAINED CONSTRUCTION DEBRIS
-NO CURBSIDE BMPS AT ANY LOT
-LOT 13 DRYWALL WASHED OUT UNCONTAINED DEBRIS
-SWEEP SITE

CALLED AND TALKED TO JAY KNOLL
09/19/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 5 DAYS
-SWEEP TRACK OUT
-SWEEP SITE
-MAINTAIN CONTROLS AT ALL INLET STRUCTURES/SCUPPERS
08/22/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 7 DAYS
-LOTS 21-24 CLEAN UP SPOILS/DIRT FROM DRIVEWAY/SIDEWALK EXCAVATION
-CURBSIDE BMPS NEEDED AT ALL ACTIVE LOTS
-SWEEP SITE
-CLEAN UP SPILLAGE AT CONCRETE WASHOUT IN STREET
-DRAINAGEWAY EROSION NEEDS TO BE ADDRESSED
08/14/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
08/02/2006 STORMWATER FOLLOW-UP INSP Correction Required -SWEEP STREETS
-EROSION IN DRAINAGEWAY WEST SIDE SOUTH OF ENTRANCE
-EROSION EAST OF LOT 19 WASHED OVER SIDEWALK
-SEDIMENT CONTROLS NEED TO BE PLACED BEHIND WEDGE CURB UNTIL LOT IS STABILIZED (V-DITCH, WATTLE, ETC)
06/27/2006 STORMWATER FOLLOW-UP INSP Correction Required -DRY WALL WASHED OUT LOT #14
-STUCCO WSAHED OUT LOT #15/#16
-CONCRETE WASH OUT NOT BERMED ON ALL SIDES
SEE PICTURES 371-373
06/22/2006 STORMWATER FOLLOW-UP INSP Correction Required TRACK OUT
LOADER USING PARK AREA TO TURN AROUND
CALLED JAY KNOLL AND ADVISED
06/08/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
05/23/2006 STORMWATER FOLLOW-UP INSP Correction Required CALLED JAY KNOLL WITH MERITAGE
CONTRACTORS ARE WASHING OUT ON A PAD RATHER THAN IN THE DESIGNATED WASH OUT AREA PROVIDED
05/18/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE IS ABOUT TO BE PAVED
BONANZA HAS BEEN CUT AND ASPHALT REMOVED FOR TIE IN
SUB GRADE IS BEING DONE
NORTHWEST LANDSCAPING WAS RESETTING SEDIMENT CONTROLS AROUND NW SIDE OF SITE
05/16/2006 STORMWATER FOLLOW-UP INSP Partial Approval WORK CONTINUES
DRIVEWAYS BEING CONSTRUCTED
PAVING TO START SOON
04/28/2006 STORMWATER FOLLOW-UP INSP Correction Required 1 NO ROCK IN STABILIZED CONSTRUCTION ENTRANCE
2 BONANZA NEEDS TO BE SWEPT
3 REMINDER: BEFORE POURING CONCRETE FOR ANY DRAINAGE STRUCTURE CALL NICHOLE 240 0153
04/14/2006 STORMWATER FOLLOW-UP INSP Partial Approval PERIMETER WALL IS BEING BUILT
NO CONCERNS AT THIS TIME
03/30/2006 STORMWATER FOLLOW-UP INSP Correction Required STABILIZED CONSTRUCTION ENTRANCE NEEDS ROCK

SOME TRACK OUT ON BONANZA
03/23/2006 STORMWATER FOLLOW-UP INSP Correction Required SPOKE TO JAY REGARDING THIS SITE 3/22
STREET NEEDS TO BE SWEPT NORTH OF OPEN TRENCH
03/17/2006 STORMWATER FOLLOW-UP INSP Correction Required DEBRIS, ROCK, CONCRETE AND ASPHALT ALL SITTING IN NW CORNER OF PROJECT IN FUTURE DRAINAGE STRUCTURE LOCATION-NEEDS TO BE HAULED OUT
03/06/2006 STORMWATER FOLLOW-UP INSP Correction Required UTILITY WORK GOING ON IN ROADWAY. NO SEDIMENT CONTROLS IN PLACE. JAY KNOLL CALLED FROM MERITAGE AND ADVISED THERE WILL BE SWPPP IN PLACE FOR THIS WORK. THIS IS OUTSIDE THE SCOPE OF THE EXISTING SWPPP.
03/03/2006 STORMWATER FOLLOW-UP INSP Correction Required OUTLET PIPES TO WASH MUST HAVE SEDIMENT CONTROLS TO PREVENT SILT FROM PROJECT GOING INTO THE ADJACENT WASH.
F/U INSPECTION 3/6
02/23/2006 STORMWATER FOLLOW-UP INSP Partial Approval NEW SILT FENCE HAS BEEN INSTALLED ON WEST SIDE WITH STRAW BALES
SITE TRACK OUT HAS BEEN CLEANED UP
O'LEARY STILL ON SITE WORKING
NO DRAINAGE IMPROVEMENTS STARTED YET
01/23/2006 STORMWATER FOLLOW-UP INSP Partial Approval STREET CUT NOT PATCHED YET

TRACKING HAS BEEN SWEPT
01/18/2006 STORMWATER FOLLOW-UP INSP Correction Required MAVERICK UNDERGROUND ONSITE DOING WATER TIE IN. SOME TRACKING ON BONANZA. STABILIZED CONSTRUCTION ENTRANCES NEED TO BE EXTENDED AND USED. CALLED AND SPOKE WITH JAY KNOLL AND ADVISED OF THE ISSUES.
01/04/2006 STORMWATER FOLLOW-UP INSP Partial Approval S.C.E NEEDS TO BE ESTABLISHED AT EVERY USED ENTRANCE FOR THE SITE
TRACKING ON BONANZA NEEDS TO BE SWEPT
12/13/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS AT THIS TIME

NO CREW ONSITE.
12/01/2005 STORMWATER FOLLOW-UP INSP Partial Approval 1. SILT FENCE DOWN AS IN PREVIOUS INSPECTION 11/16
2. ENSURE CONSTRUCTION TRAFFIC USES S.C.E.
11/16/2005 STORMWATER FOLLOW-UP INSP Partial Approval STORMWATER CONTROLS ARE IN GOOD SHAPE
1 LOCATION ON NE SIDE SILT FENCE NEEDS TO BE REPAIRED
ALL SWPPP TO BE PUT BACK IN PLACE ALONG WEST SIDE OF PROJECT WHEN GRADING COMPLETE. STRAW BALES AND GRADE BREAK ARE SUFFICIENT FOR NOW IN ROW

PLZ CALL FOR INSP WEHN DRAINAGE STRUCTURES ARE IN FORM STAGE (SPOKE TO SCOTT WITH O'LEARY CONST)
10/28/2005 STORMWATER FOLLOW-UP INSP Correction Required MET WITH JAY KNOLL 481-0837 AND LAURA

REPAIR SILT FENCE ALONG EAST PERIMETER

PLEASE ENSURE O'LEARY IS AWARE OF REQUIREMENT FOR INSPECTION OF ALL DRAINAGE STRUCTURES IN FORM STAGE BEFORE CONCRETE IS POURED