Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2008 | GRADING - FINAL | Approved | ||
| 12/03/2007 | GRADING - FINAL | Denied | 1. THE REVISED GRADING PLAN DOES NOT SHOW THE DRAINAGE MODIFICATIONS TO THE ROOF AND SITE DRAINAGE PATTERNS. 2. PROVIDE BICYCLE PARKING AS SHOWN ON THE REVISED PLAN. 2. PROVIDE BICYCLE PARKING AS SHOWN ON THE PLAN. |
|
| 10/03/2006 | GRADING - FINAL | Denied | 1. PROVIDE REVISED GRADING AND SITE PLANS FOR MODIFICATIONS TO THE ROOF DRAINAGE, SOLID WASTE TRASH ENCLOSURES, AND THE HANDICAP PARKING. 2. PROVIDE BICYCLE PARKING AS SHOWN ON THE PLAN. |
|
| 09/29/2006 | GRADING - FINAL | Denied | SITE VISIT TO MEET BOB AND ERNIE DUARTE | |
| 11/03/2005 | GRADING - FINAL | Denied | 1. PROVIDE REVISED GRADING AND SITE PLANS FOR MODIFICATIONS TO THE SOLID WASTE TRASH ENCLOSURES. 2. COMPLETE ROCK RIP RAP IN RETENTION/DETENTION BASIN. 3. PROVIDE 42" BARRICADE RAILING AT RETENTION BASIN PERIMETER 4. PROVIDE A CERTIFICATION LETTER FROM AN ARIZONA REGISTERED PROFESSIONAL ENGINEER THAT STATES THAT THE RETENTION/DETENTION BASIN HAS BEEN DESIGNED AND CONSTRUCTED TO THE DESIGN STANDARDS. 5. CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. 6.PROVIDE TEMPORARY FENCING TO BARRICADE RETENTION/ DETENTION BASIN AND WHERE ON-GOING CONSTRUCTION ACTIVITY IS OCCURRING TO PREVENT PEDESTRIAN ACCESS. 7. PROVIDE PAINTED ARROWS ON PAVEMENT AND ONE WAY SIGNS AT THE (2) EAST SIDE DRIVEWAYS. OK FOR TCO |