Inspection History Details
Inspection Status: Approved
Inspection History: POOL/SPA PRE-GUNITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2005 | POOL/SPA PRE-GUNITE | Approved | IVRS - Inspection :* | |
| 04/18/2005 | POOL/SPA PRE-GUNITE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE CAUTION TAPE 6" ABOVE ? GAS LINE PER 2003 IRC SECTION 2415.9 AMMENDED 2) YOU MUST PROVIDE 36" SEPERATION FROM INSIDE EDGES OF SECTION INLETS PER 2003 IRC SECTION AG106.4. PLEASE PROVIDE ON SITE THE INLET PIPE TO ANTI VORTEX COVER ADAPTER AND THE ANTI VORTEX COVERS AND THEIR INSTALLATION INSTRUCTIONS AS WELL AS PUMP SUCTION FLOW RATES 3) POOL HEATER MUST HAVE TEMPERATURE AND PRESSURE RELIEF VALVES PER 2003 IRC SECTION M2006.3 4) YOU MUST COMPLY WITH 2003 IRC SECTION AG106 BY FINAL INSPECTION |