Inspection History Details
Inspection Status: Continued
Inspection History: GRADING - FINAL
Permit Number - T05BU00221
Inspection Description - GRADING - FINAL
Inspection Status - Continued
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2013 | GRADING - FINAL | Continued | TALKED WITH PROJECT MANAGER, WILL DO FINAL GRADING INSPECTION TOMORROW | |
| 07/18/2013 | GRADING - FINAL | Approved | ||
| 07/12/2013 | GRADING - FINAL | Continued | NO FINAL GRADING INSPECTION CALLED IN, WALKED SITE | |
| 03/19/2013 | GRADING - FINAL | Continued | SITE CONSTRUCTION NOT 100% COMPLETE | |
| 03/08/2013 | GRADING - FINAL | Continued | DROVE THROUGH THE SITE TOO SEE THAT ALL THE WORK HAS BEEN COMPLETED. THERE IS SOME OF THE SITES STILL OPEN AT THIS TIME THAT HAVE MISSING SIDEWALK AND DRIVEWAYS. THE REST OF THE SITE WILL BE CHECKED TOO MAKE SURE THAT ALL THE OTHER AREAS HAVE BEEN COMPLETED PER THE APPROVED PLANS. | |
| 01/04/2013 | GRADING - FINAL | Continued | NO CHANGES AT THIS TIME | |
| 12/20/2012 | GRADING - FINAL | Continued | NO CHANGES, CONTRACTORS BUILDING REMAINING HOMES. NO STORM WATER CONCERNS. ONLY SIDEWALKS AND DRIVEWAYS LEFT FOR SITE WORK |
|
| 12/06/2012 | GRADING - FINAL | Partial Approval | ALL INFRUSTRUCTURE AND ITEMS ON THE APPROVED GRADING PLAN HAVE BEEN COMPLETED EXCEPT FOR THE REMAINIG SIDEWALKS AND DRIVEWAYS FOR THE LAST HOUSE S BEING BUILT | |
| 08/28/2012 | GRADING - FINAL | Continued | SITE NOT 100% COMPLETE. SOME LOTS LEFT TO BE BUILT OUT. CONTRACTOR NEEDS TO CALL IN FOR FINAL GRADING. ALL SITE WORK HAS BEEN COMPLETED EXCEPT FOR SIDEWALKS IN FRONT OF REMAINING LOTS. |
|
| 07/25/2012 | GRADING - FINAL | Partial Approval | PARTIAL APPROVAL FOR FINAL GRADING. APPROXIMATELY 10-15 LOTS LEFT TO BE BUILT, ALL IN DIFFERENT STAGES OF CONSTRUCTION. ALL OTHER SITE WORK HAS BEEN COMPLETED. PROVIDE AN AS-BUILT AND CERT STATEMENT FROM THE ENG OF RECORD. |
|
| 04/14/2010 | GRADING - FINAL | Continued | MET W/ SITE SUPERINTENDENT AND DISCUSSED REQIUREMENTS NEEDED TO CLOSE AND FINAL PERMIT: 1) COMPLETE ALL SIDEWALKS 2) COMPLETE ALL HC RAMPS 3) COMPLETE ALL COMMON AREAS 4) COMPLETE ALL DRAINAGE STRUCTURES TO INCLUDE SCUPPERS 5) COMPLETE ALL UNDEVELOPED LOTS OR STABILIZED THEM W/ ROCK OR HYDROSEED. 6) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT THE SITE WAS COMPLETED PER THE APPROVED PLANS. |
|
| 10/05/2007 | GRADING - FINAL | Correction Required | PRIOR TO FINAL GRADING APPROVAL PROVIDE A DRAINAGE CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT ALL DRAINAGE WAYS AND RET/DET BASINS ON SITE WERE BUILT IN ACCORDANCE WITH THE APPROVED GRADING PLAN. | |
| 02/08/2007 | GRADING - FINAL | Correction Required | SEDIMENT CONTROLS THAT ARE IN PLACE MUST BE MAINTAINED. IF STORM WATER CONTROLS ARE NOT REQUIRED FOR SPECIFIC AREAS DUE TO THE FACT THAT THE AREA IS STABILIZED, REMOVE CONTROLS. MAINTAIN ALL SEDIMENT CONTROLS ALONG NORTH MANOR WASH. COMPLY BY 2/14/07 NON - COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION |
|
| 09/19/2006 | GRADING - FINAL | Denied | PRIOR TO FINAL GRADING APPROVAL: 1) COMPLETE ALL SIDEWALKS, CURBS, AND STREETS. 2) COMPLETE ALL DRAINAGE STRUCTURES, (RET/DET BASINS, SCUPPERS WEIRS....). 3) STABILIZE AREAS NOT COMPLETED PER YOUR GRADING PLAN. 4) FINAL YOUR STORM WATER PERMIT AND REMOVE REMAINING SEDIEMNT CONTROLS. 5) COMPLETE SITE WORK PER PLAN OR USE SUPPLEMENTAL STABILIZATION IN LANDSCAPE AREAS, OPEN LOTS OR ON SLOPES. |