Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T05BU00164
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/29/2008 | GRADING - FINAL | Approved | Contractor removed sand bags from catch basin. | |
12/15/2008 | GRADING - FINAL | Partial Approval | Contractor removed sand bags for basin. | |
12/01/2008 | GRADING - FINAL | Denied | Contractor provided letter from engineer for site cert. and as-built for southwest corner. Contractor needs to complete #8 on punch list | |
11/27/2008 | GRADING - FINAL | Denied | Contractor still needs to remove sand bags from catch basin. | |
09/19/2008 | GRADING - FINAL | Denied | Contractor completed items 4, 5 and 7 on punch list dated 5/29/08. | |
08/04/2008 | GRADING - FINAL | Denied | Contractor still has not placed rip rap on southeast corner of project. | |
05/29/2008 | GRADING - FINAL | Denied | Contractor needs to: 1- Provide letter from engineer per COT drainage manual, chapter XIV, section 14.2 (7). (Site cert.) 2- Provide revised drawing for drainage structure on southwest corner of project. 3- Install DG in basin #2. Westside (wall added). 4- Remove material from east side of project. (small stockpile) 5- Repair curb next to scupper southwest corner of project. 6- Provide 4to1 side slope southwest corner (Drainage channel). Per approved plans. 7- Install rip rap southeast corner of project per approved plans. Place or remove material dumped in channel. 8- Remove sand bags from basin #2 discharge box. |
|
05/20/2008 | GRADING - FINAL | Partial Approval | Contractor repaired erosion on southwest corner. Contractor needs to provide as-built plan for approval. Spoke to Eric in regards to. Eric to call in for final grading on Tuesday 5/27/08. | |
03/19/2007 | GRADING - FINAL | Partial Approval | No activity. All areas stabilized. Contractor needs to call in final inspection. For phase I and II. | |
02/22/2007 | GRADING - FINAL | Partial Approval | Contractor finished last house. Contractor needs to call in final grading. Left message for Dennis site super. Also contractor needs to repair sidewalk front of 6458 Sunrise Valley (trip hazard). | |
08/09/2006 | GRADING - FINAL | Correction Required | Met on site with Nicky with K.B. Home and thier engineer and the super from O'Leary. Discussed repairs to the concrete ramp on the southwest corner of the project. Erosion removing material from under pad. I explained to all that any changes need to be approved by Elizabeth city engineer first. | |
07/28/2006 | GRADING - FINAL | Correction Required | Contractor needs to address erosion under concrete spillway/access ramp. Southwest corner of property. |