Permit: T05BU00160


Addresses:

7250 E ESCALANTE RD

Inspection Status: Continued

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
02/07/2011 STORMWATER FOLLOW-UP INSP Continued NO CONCERNS AT THIS TIME.
05/17/2007 STORMWATER FOLLOW-UP INSP Continued BASIN CHECK
NO RAIN FROM STORM YESTERDAY
04/16/2007 STORMWATER FOLLOW-UP INSP Correction Required EVIDENCE OF STANDING WATER IN BASIN
11/07/2006 STORMWATER FOLLOW-UP INSP Correction Required 2ND NOTICE TO SWEEP UP AT OLD DUMPSTER LOCATION
10/30/2006 STORMWATER FOLLOW-UP INSP Correction Required PICS 10-30-06 1 AND 2

CORRECTION NOTICE ISSUED 5 DAYS
-CLEAN UP DEBRIS AROUND DUMPSTER
-SWEEP STREET
-CLEAN UP CONCRETE WASHOUT FROM BASIN
-REMOVE SEDIMENT FROM BASIN INLET
10/16/2006 STORMWATER FOLLOW-UP INSP Partial Approval LABORER ON SITE SWEEPING
10/13/2006 STORMWATER FOLLOW-UP INSP Correction Required BASIN HAS BEEN PUMPED

CORRECTION NOTICE ISSUED 5 DAYS

-SWEEP STREET AND REMOVE SEDIMENT AT BASIN INLET
-SWEEP AROUND DUMPSTER AREA
10/10/2006 STORMWATER FOLLOW-UP INSP Correction Required PIC 1473

STANDING WATER IN BASIN-MUST BE PUMPED
COMPLY WIHT STORMWATER DISCHARGE PERMIT-PUMP FILTERED WATER INTO ROADWAY NOT OVER WALL

INSPECTION IS 24+ HOURS AFTER LAST RAIN

CALLED LARRY SEAL 8:32 NOTICE SENT VIA MAIL WITH PHONE CONTACT
10/03/2006 STORMWATER FOLLOW-UP INSP Correction Required DROVE SITE
SUPER NOT THERE
WARNED HENDEN CONCRETE ABOUT WASHING OUT CONCRETE TOOLS IN ROADWAY
09/28/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 10 DAYS

CLEAN UP AROUND DUMPSTER (SWEEP)

*BASIN CERTIFICATION MUST BE RECEIEVED BEFORE FINAL GRADING CAN BE APPROVED
09/15/2006 STORMWATER FOLLOW-UP INSP Partial Approval WATTLE INSTALLED
DEBRIS CLEANED UP
09/05/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 3 DAYS

-CLEAN UP ALL CONSTRUCTION DEBRIS AROUND DUMPSTERS AND IN FRONT OF LOTS AT WEST END OF STREET
-INSTALL WATTLE AT CURBSIDE TO PREVENT STOCKPILES FROM ENTERING THE STREET
08/25/2006 STORMWATER FOLLOW-UP INSP Partial Approval LABORER ON SITE SWEEPING/CLEANING

TALKED TO LARRY ABOUT STANDING WATER ISSUES
08/24/2006 STORMWATER FOLLOW-UP INSP Partial Approval FOLLOW UP INSP
TALKED TO MATT
-STANDING WATER
-CONST DEBRIS STILL THERE
-SWEEPING STILL NEEDS TO BE DONE
08/22/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 2 DAYS
-CLEAN UP SEDIMENT FROM STREET (BASIN INLET)
-ADDRESS STANDING WATER IN BASIN
----------DO NOT PUMP OVER WALL-----
MAINTAIN COMPLIANCE WITH AZPDES
FILTER DISCHARGE INTO STREET

STOP WORK AND/OR CITATION WILL RESULT
CALLED LARRY SEAL AND ADVISED
MATT SITE SUPER SIGNED FOR NOTICE
08/11/2006 STORMWATER FOLLOW-UP INSP Correction Required MET ON SITE WITH LARRY SEAL
SEE PICS 1001-1002
STANDING WATER IN BASIN
LARRY HAS BEEN PLACING MOSQUITO "DOUGHNUTS"
KENT DELPH IS THE ENGINEER FOR THIS PROJECT AND PER LARRY HE HAS BEEN MADE AWARE OF THE BASIN CERTIFICATION LETTER REQUIREMENT AND THAT THE BASIN IS NOT WORKING
LARRY IS GOING TO START WORK (MUCKING OUT) ON THE BASIN
08/07/2006 STORMWATER FOLLOW-UP INSP Partial Approval DROVE SITE ON WAY TO FREESTONE TERRACE

2 LABORERS SWEEPING SEDIMENT FROM STREET.
SITE HAD SOME RAIN
DETENTION BASIN STILL IN NEED OF ATTENTION (REDESIGN?)
LAST HOME BEING FRAMED OUT
07/25/2006 STORMWATER FOLLOW-UP INSP Partial Approval MET WITH LARRY SEAL ON SITE

DISCUSSED BASIN HOLDING WATER AND BASIN CERTIFICATION REQUIREMENTS FOR FINAL ASSURANCE RELEASE

SITE IN MUCH BETTER CONDITION-SOME SWEEPING NEEDS TO BE DONE

LAST HOUSE IN FRAME STAGE
07/11/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE IN MUCH BETTER CONDITION
STILL STANDING WATER IN BASIN
07/10/2006 STORMWATER FOLLOW-UP INSP Correction Required TALKED TO NICHOLAS BUILDERS REGARDING GARBAGE/SILT/WASHOUT
SITE IN POOR SHAPE
SEE PICTURES 485-499 TWO DIFFERENT DAYS 7/7 AND 7/10
07/07/2006 STORMWATER FOLLOW-UP INSP Correction Required SPOKE TO LARRY 7/6
WENT AND VISITED SITE TODAY
STANDING WATER
DEBRIS/GARBAGE IN ROADWAY
WASH OUT ON SITES
TRACK OUT IN ROADWAY

CALLED LARRY AND ADVISED
06/30/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. CLEAN UP DEBRIS IN PAVEMENT AREA BY ROLL OFF DUMPSTERS
2. CLEAN UP DEBRIS (TIRE, PIPE, MESH) FROM BASIN
3. REPLACE SEDIMENT CONTROLS IN FRONT OF SIDEWALK SCUPPER
4. EVIDENCE OF WASH OUT IN BASIN (NEEDS TO BE REMOVED)
5. SWEEP STREETS AND KEEP DIRT BEHIND WEDGE CURB
6. CONCRETE/STUCCO WASHED OUT IN FRONT OF 7190, 7184 AND 7286.
7. NO CONCRETE WASH OUT ON SITE-PLACE WASH OUT WITH SIGNAGE AND ENSURE IT'S USE

SEE PICTURES 401-406
05/31/2006 STORMWATER FOLLOW-UP INSP Correction Required STREETS NEED TO BE SWEPT
CHANGES TO BASIN DESIGN MUST BE SUBMITTED TO CITY OF TUCSON AND REVIEWED BEFORE ASSURANCE RELEASE/FINAL C OF O'S
BASIN CERTIFICATION LETTER MUST BE RECEIVED BEFORE FINAL GRADING/ASSURANCE ACCEPTANCE
05/17/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE IS ALMOST COMPLETE
LANDSCAPING AND CLEAN UP WORK IS ONGOING
04/28/2006 STORMWATER FOLLOW-UP INSP Correction Required MET WITH LARRY SEAL
HE IS AWARE THAT THE CHANGES MADE TO THE BASIN WILL NEED TO BE STAMPED BY HIS ENGINEER AND REVIEWED BY COT
04/27/2006 STORMWATER FOLLOW-UP INSP Correction Required BASIN BEING RIP RAPPED F/U INSP FOR 4/28
04/03/2006 STORMWATER FOLLOW-UP INSP Correction Required ROCK RIP RAP BEING STORED/STAGED IN BASIN
THERE HAS BEEN NO WORK DONE ON BASIN TO PREVENT STANDING WATER
A COPY OF STORMWATER FOLLOW-UP INSPECTIONS AND A LETTER TO GO OUT TO BUILDER TO ADVISE OF WORK NEEDED ON BASIN
03/23/2006 STORMWATER FOLLOW-UP INSP Correction Required BASIN IS HOLDING WATER
SITE NEEDS TO BE SWEPT
03/21/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE IS FRAMED OUT ON NORTH SIDE OF PROJECT
SITE NEEDS TO BE SWEPT
03/09/2006 STORMWATER FOLLOW-UP INSP Correction Required SITE NEEDS TO BE SWEPT
SITE SUPER CALLED-LABORER TO SWEEP 3/10
02/28/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE IN GOOD CONDITION
NOI HAS BEEN REPOSTED
02/22/2006 STORMWATER FOLLOW-UP INSP Partial Approval SPOKE WITH HOUSING SUPER
SITE NEEDS SOME SWEEPING DONE
02/21/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE NEEDS SWEEPING
02/02/2006 STORMWATER FOLLOW-UP INSP Partial Approval SWEEPING IS TAKING PLACE-TRACKING ISSUE IS IMPROVED
AZPDES POSTED ON C-BOX
BASIN INLET HAS STRAWBALES
CLOSE OUT NOTICE OF VIOLATION
02/01/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE IN GOOD CONDITION
ALL STREETS HAVE BEEN SWEPT
ALL SWPPP IS IN PLACE
TRACK OUT IS BEING BETTER MANAGED
01/18/2006 STORMWATER FOLLOW-UP INSP Correction Required SITE CONTINUES TO HAVE TRACK OUT ISSUES
BASIN INLET NEEDS SEDIMENT CONTROLS
SITE NEEDS TO BE SWEPT

SENDING LETTER INCLUDING NEW STORMWATER ORDINANCE AND A COPY OF THE AZPDES. 10 DAYS TO GET COMPLIANCE OR CITATION.
01/12/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE NEEDS TO BE SWEPT
CONCRETE WASH OUT IN PLACE AND SIGNED
01/06/2006 STORMWATER FOLLOW-UP INSP Partial Approval AZPDES/SWPPP POSTING ON C-BOX
PER LARRY SWEEPING WILL HAPPEN AT LEAST ONCE A WEEK.
01/04/2006 STORMWATER FOLLOW-UP INSP Correction Required FINAL NOTICE: AZPDES/NPDES/SWPPP INFO MUST BE POSTED PLEASE USE THE GREEN CARD PROVIDED BY INSPECTOR. IF NOT POSTED A NOTICE OF VIOLATION WILL BE ISSUED AT NEXT INSPECTION 1/6/06.

-CONCRETE WASH OUT MUST BE SIGNED
-SITE HAS BEEN SWEPT- PLEASE PROVIDE A SWEEPING SCHD
-DEBRIS HAS BEEN REMOVED FROM BASIN

LARRY,
DON'T FORGET, TO FINAL OUT YOUR GRADING PERMIT AND GET YOUR RESEEDING BOND BACK YOU HAVE TO HAVE YOUR BASIN CERTIFIED BY AN ENGINEER.
01/03/2006 STORMWATER FOLLOW-UP INSP Correction Required -SEDIMENT ON SITE IS UNACCEPTABLE
-BASIN BEING USED AS A CONCRETE WASH OUT
-LFT MSG @ 449-4719 RE NOV, CITATION + STOPWORK 8:57/290-2936# HAS A FULL MAILBOX 8:56/449-5753# IS BAD NUMBER 8:56A/NO ANSWER AT 624-0988 NICHOLAS BUILDING.

PER SWPPP
9.1.3 D-NO CONCRETE WASH OUT ON SITE AS REQUIRED
2.2 SITE DRAINAGE IS DESIGNED FOR BASIN (SW CORNER) AND FOR OVER FLOW ONTO ESCALANTE (INTO PANTANO WASH)

OUTSTANDING ISSUES FROM PREVIOUS INSPECTIONS:
1. CONCRETE WASH OUT NEEDS TO BE ON SITE AND SIGNED
2. SWPPP NEEDS TO BE POSTED/ON SITE
3. AZPDES NEEDS TO BE ONSITE AND POSTED
4. 3RD NOTICE FOR TRACKING NEEDS TO BE SWEPT
5. CONSTRUCTION DEBRIS NEEDS TO BE REMOVED FROM BASIN (SW CORNER OF PROJECT)
12/19/2005 STORMWATER FOLLOW-UP INSP Correction Required SPOKE TO LARRY SEAL (SITE SUPER) NICHOLAS BUILDING IS GENERAL CONTRACTOR ON SITE. LARRY WILL CHECK FOR AND POST DEQ/AZPDES/SWPPP/NPDES DOCUMENTATION. THERE IS AN ISSUE WITH VANDALISM AT THIS SITE. LARRY WILL CALL AND ARRANGE FOR A PLACE ON SITE.
12/15/2005 STORMWATER FOLLOW-UP INSP Correction Required 1. CONCRETE WASH OUT NEEDS TO BE ON SITE AND SIGNED
2. SWPPP NEEDS TO BE POSTED/ON SITE
3. AZPDES NEEDS TO BE ONSITE AND POSTED
4. 3RD NOTICE FOR TRACKING NEEDS TO BE SWEPT
5. CONSTRUCTION DEBRIS NEEDS TO BE REMOVED FROM BASIN (SW CORNER OF PROJECT)
LEFT MESSAGE FOR BOB 449-4719 INSPECTION ON SITE (ADDRESS SIGN) NO SITE SUPERINTENDENT AVAILABLE
12/15/2005 STORMWATER FOLLOW-UP INSP Correction Required SENT CORRECTION NOTICE TO DESERT AMERICAN BUILDERS CORP. OFFICES:

1. CONCRETE WASH OUT NEEDS TO BE ON SITE AND SIGNED
2. SWPPP NEEDS TO BE POSTED/ON SITE
3. AZPDES NEEDS TO BE ONSITE AND POSTED
4. 3RD NOTICE FOR TRACKING NEEDS TO BE SWEPT
5. CONSTRUCTION DEBRIS NEEDS TO BE REMOVED FROM BASIN (SW CORNER OF PROJECT)
LEFT MESSAGE FOR BOB 449-4719 INSPECTION ON SITE (ADDRESS SIGN) NO SITE SUPERINTENDENT AVAILABLE
11/29/2005 STORMWATER FOLLOW-UP INSP Correction Required 1. CONCRETE WASH OUT NEEDS TO BE ON SITE AND SIGNED
2. SWPPP NEEDS TO BE POSTED/ON SITE
3. AZPDES NEEDS TO BE ONSITE AND POSTED
4. 2ND NOTICE FOR TRACKING NEEDS TO BE SWEPT

LEFT INSPECTION ON SITE (ADDRESS SIGN) NO SITE SUPERINTENDENT AVAILABLE
11/16/2005 STORMWATER FOLLOW-UP INSP Correction Required HEAVY TRACKING FROM FOUNDATION CONTRACTORS.

GAVE PAPERWORK TO SITE SUPER AND ASKED ABOUT SWPPP POSTING

RESCHEDULE FOR INSP 11/23
09/15/2005 STORMWATER FOLLOW-UP INSP Partial Approval CHECKED THIS SITE TO SEE IF THERE WERE ANY CONCERNS AT THIS TIME. THE ROADWORK FOR THE SITE HAS BEEN COMPLETED BUT IS SHOWING SIGNS OF HEAVY DEPOSITS THROUGHOUT THE SITE. THE DEVELOPERS CONSTRUCTION TRAILOR HAS BEEN LOCKED DURING BOTH OF MY VISITS ON THIS DATE, I LEFT A MESSAGE WITH THE CREW ON SITE TO HAVE THE DEVELOPER CALL ME ONCE HE HAS RETURNED.
07/18/2005 STORMWATER FOLLOW-UP INSP Partial Approval SITE HAS ENTRANCES PAVED AND RETENTION/DETENTION BASIN CUT IN ROUGH CUT. APPROX 7 HOMES CONSTRUCTED AT THIS TIME. CONTACTED THE OWNER TO DISCUSS THE NEED TO HAVE HIS BASIN CERTIFIED AND HE EXPLAINED HE IS HAVING THAT ALREADY REQUESTED THROUGH THE ENGINEER OF RECORD. DISCUSSED THE REQUIREMENT FOR TRUNCATED DOMES ALONG ALL ADA RAMPS AND SIDEWALKS. HE EXPLAINED THE RIGHT-OF-WAY INSPECTOR, DEE, HAS ALSO DISCUSSED THE NEW REQUIREMENT ALONG THE RIGHT OF WAY.
07/07/2005 STORMWATER FOLLOW-UP INSP Partial Approval FOLLOW UP INSPECTION ONLY. NO MAJOR STORM WATER CONCERNS AT THIS TIME. MAIN ENTRANCE HAS BEEN SWEPT OF LOOSE SEDIMENT AS REQUESTED.
06/28/2005 STORMWATER FOLLOW-UP INSP Partial Approval Called the site superintendent and requested to have the street swept of loose sediment. A re-inspection will be required on Wednesday July 6th.
06/14/2005 STORMWATER FOLLOW-UP INSP Partial Approval This site has begun to construct curb and turn lane/entrances along Escalante and Poinciana Dr. No major storm water concerns at this time.