Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2005 | FIRE SPKLR - FINAL | Approved | ||
| 06/15/2005 | FIRE SPKLR - FINAL | Denied | 1. Provide verification of electrical permit for booster pump wiring. 2. Remove FDC or hydrostatically test all piping downstream of pump at 200 psi. |