Permit Number - T05BU00043

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Correction Required

Date Description Inspector Results Comments
01/31/2007 STORMWATER FOLLOW-UP INSP Correction Required TRACK OUT FROM OLEARY WORKING ON VOYAGER SITE
AZCON 16597

2-1-07 CALLED JOHN CHASE 404 8749 WITH O'LEARY AND REQUESTED A MORE REGULAR SWEEPING SCHEDULE
HE INFORMED ME THAT SWEEPERS ARE SCHD FOR EVERY FRIDAY
01/09/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 10 DAYS
MAINTAIN SEDIMENT CONTROLS AT INLET SCUPPERS AT PARK
11/27/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 10 DAYS
-ADDRESS STANDING WATER IN VLG 3 DRAINAGEWAY FROM PARK
-SWEEP PANTANO E OF VLG 6
-MAINTAIN SEDIMENT CONTROLS AT SCUPPER ON VOYAGER
-ADDRESS EROSION AT CMU WALL WEEPHOLES INTO DRAINAGE ON VOYAGER
11/16/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 10 DAYS
-PUMP STANDING WATER IN COMMON AREA A VILLAGE 3 (BTWN LOTS 11 + 12)
-SWEEP TRACK OUT EAST OF RAMADA (SOUTH SIDE OF PARK)
-SWEEP PANTANO
-SWEEP EAST END OF SYCAMORE PARK BLVD
10/17/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 7 DAYS

-REPLACE WATTLES SW SCUPPER AT PARK
-CLEAN DRAINAGEWAY AND MAINTAIN CONTROLS (COMMON AREA LOT 11 AND 12 VILLAGE 3)
-REPLACE WATTLES AT SCUPPER SOUTH SIDE OF PARK WEST OF RAMADA
-REPLACE WATTLES AT SCUPPER SOUTH SIDE OF PARK EAST OF RAMADA
-NORTH END OF PANTANO- ADDRESS STANDING WATER, MAINTAIN SEDIMENT CONTROLS AND REMOVE CONCRETE WASHOUT
-SWEEP VOYAGER AND REMOVE SEDIMENT FROM RIGHT-OF-WAY
-MAINTAIN CONTROLS AT SCUPPERS ON VOYAGER
09/20/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 5 DAYS
-CLEAN UP EROSION ON VOYAGER
-RE-ESTABLISH SEDIMENT CONTROLS AT ALL SCUPPER LOCATIONS
-SWEEP MAIN STREET
-CLEAN UP CONCRETE WASH OUT AT NORTH END OF PANTANO
09/11/2006 STORMWATER FOLLOW-UP INSP Correction Required FAXED OLD INSPECTIONS TO VIRGINA AT AAA FOR PM INFO
09/08/2006 STORMWATER FOLLOW-UP INSP Correction Required CONTACTED AAA FOR SITE SUPER INFORMATION

TALKED TO CATHY AND THEN WAS TRANSFERRED TO VIRGINA FAX 696-0314
08/09/2006 STORMWATER FOLLOW-UP INSP Correction Required -SWEEP SYCAMORE PARK BLVD
-SWEEP SYCAMORE PARK LOOP (NORTH AND SOUTH)
-STANDING WATER IN DRAINAGEWAY (SYCAMORE PARK LOOP SOUTH) NEEDS TO BE ADDRESSED-SWPPP CONTROLS NEED TO BE RE-ESTABLISHED
-SWEEP PANTANO RD
07/13/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE SENT TO AAA LANDSCAPING 7/25
1. SYCAMORE PARK BLVD AND LOOP NEED TO BE SWEPT
2. SOUTH END OF KOLB RD NEEDS TO BE SWEPT
3. PANTANO RD NORTH AND SOUTH OF BOX CULVERT NEED DIRT RAMPS REMOVED AND SWEPT
4. WATTLES NORTH OF VLG 3 AND STRAWBALES/SILT FENCE ON THE SOUTH SIDE OF THE DRAINAGEWAY (VLG 3) NEED MAINTENANCE.
5. GARBAGE AT SCUPPER AT FOUR SEASONS AND SYCAMORE PARK NEEDS TO BE REMOVED/CLEANED UP
05/19/2006 STORMWATER FOLLOW-UP INSP Partial Approval AAA LANDSCAPING HAS PLACED SEDIMENT CONTROLS
05/12/2006 STORMWATER FOLLOW-UP INSP Correction Required FOUND AAA LANDSCAPING SUPERVISOR (TED) ONSITE. PER RICK DOJAQUES BORDERLAND WAS ADVISED BY DON DIAMOND TO TURN OVER ALL SWPPP TO AAA FOR THE MAIN BOULEVARD. EACH VILLAGE IS SWPPP RESPONSIBILITY OF INDIVIDUAL BUILDERS
05/11/2006 STORMWATER FOLLOW-UP INSP Correction Required PLACE ROCK UNDER KLEIN TANK AND WHERE WATER TRUCKS ARE ENTERING PAVEMENT (SCE)
PLACE SEDIMENT CONTROLS AT ALL INLET STRUCTURES AS RIP RAP IS PLACED
04/03/2006 STORMWATER FOLLOW-UP INSP Partial Approval PAVING WORK CONTINUING
NO CONCERNS AT THIS TIME
03/13/2006 STORMWATER FOLLOW-UP INSP Correction Required NO SEDIMENT CONTROLS AT S END OF KOLB RD
BLOWN OUT STRAWBALES AT CROWS NEST COURT
SEDIMENT CONTROLS AT ALL COMPLETED SCUPPER INLETS (RIP RAPPED)
PROTECT CATCH BASINS W/ SEDIMENT CONTROLS
USE CONCRETE WASH OUTS
SWEEP KOLB RD

SPOKE TO RICK DOJAQUEZ 260-4594
02/28/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
02/09/2006 STORMWATER FOLLOW-UP INSP Partial Approval MET WITH ROBERT W/ WESTLAND RESOURCES 419-5638 DISCUSSED MISSING BMPS AT END OF KOLB RD.
01/25/2006 STORMWATER FOLLOW-UP INSP Partial Approval SPINE ROAD HAS WEDGE CURB IN TO MID POINT
CONTACTED MATTAUSCH VIA CELL REGARDING:
TRACKING ON KOLB AND VOYAGER-HE WILL HAVE IT SWEPT
NO SWPPP IN PLACE AT SOUTH END OF KOLB.
01/09/2006 STORMWATER FOLLOW-UP INSP Partial Approval TRACKING ON VOYAGER RD NEEDS TO BE SWEPT
12/19/2005 STORMWATER FOLLOW-UP INSP Partial Approval SOME SIGNS OF WASH OUT NE SIDE OF PROJECT BY RETENTION BASIN
SECONDARY CONTAINMENT AROUND FORM RELEASE AT DRAINAGE STRUCTURE OVER NORTH FORK AIRPORT WASH??
V DITCH HAS REPLACED SOME SILT FENCE ALONG N PERIMETER OF PROJECT.
11/18/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS AT THIS TIME
ALL SWPPP IN PLACE AND APPEAR TO BE WORKING
MET WITH DAN MATTAUSCH 730-9447
SWPPP POSTING AT WEST SCE
DAN WILL CHECK ON SECONDARY CONTAINMENT FOR FORM RELEASE BEING USED ON BOX CULVERT OVER THE PANTANO WASH
05/13/2005 STORMWATER FOLLOW-UP INSP Partial Approval THIS SITE WILL HAVE ALL COMMENTS ENTERED UNDER THIS PERMIT NUMBER ABOVE, (T04BU02317). NO MAJOR STORM WATER CONCERS AT THIS SITE AT THIS TIME. SITE IS