Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T05BU00017
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/13/2007 | GRADING - FINAL | Approved | Contractor completed punch list. | |
03/07/2007 | GRADING - FINAL | Partial Approval | Droped off prelim. punch list. Discussed basin on Northwest side. | |
03/06/2007 | GRADING - FINAL | Partial Approval | Preliminary punch list: 1- Have engineer certify all basins and drainage, per chapter XIV, section 14.2 (7). Also address phase 2 building pad. 2- Clean parking lot. 3- Stabilize all areas disturbed by construction. 4- Remove all SWPPP controls. 5- Install gates on trash enclosure. 6- Paint all post barricades. 7- Complete all basin work. 8- Complete all fence work. 9- Provide as-built elev. for all basins. 10- Install spillway at all curb cuts, per approved drawings. 11- Remove trash dumpster and port-a-potty. 12- Remove all construction debris. 13- Complete all sidewalk and scupper work, per the approved plans. 14- Install header back of handicap ramp south side of building. 15- Install all rip rap work, per the approved drawings. 16- Install header in handicap ramp northwest side of building. 17- Replace broken sidewalk northwest corner of building. 18- Complete all parking lot striping. 19- Complete all handicap parking. 20- Address all permit conditions. |
|
08/05/2005 | GRADING - FINAL | Correction Required | No activity at this time. |