Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/16/2005 | GRADING - FINAL | Approved | ||
| 11/10/2005 | GRADING - FINAL | Not ready for Inspection | THIS SITE WILL REQUIRE THE FOLLOWING ACTIONS TO BE TAKEN PRIOR TO THE FINAL GRADING INSPECTION BEING COMPLETED: 1) VERIFICATION THAT ALL EXTERNAL WALLS ARE CONSTRUCTED AS SPECIFIED IN THE TENTATIVE AND FINAL PLAT, THE INTERNAL DIMENSIONS FOR WALL HEIGHTS DOES NOT MEET 5'. 2) THE TRASH ENCLOSURE FOR THIS SITE DOES NOT MEET THE CURRENT STANDARDS. CURRENT STANDARDS CALL FOR A 10' x 10' INTERNAL OPEN CLEAR SPACE, THE ENCLOSURE HAS AN EXTERNAL MEASUREMENT AT THE SAME DIMENSIONS. A LETTER OF ACCEPTANCE FROM THE SOLID WASTE DEPARTMENT WILL BE THE MINIMAL REQUIREMENT FOR ACCEPTANCE OF THIS STRUCTURE IN THE CURRENT CONDITION, OR THE STRUCTURE MAY BE RE-BUILT TO THE CURRENT STANDARDS. |
|
| 10/25/2005 | GRADING - FINAL | Not ready for Inspection | 1) ENSURE ALL SEDIMENT AND CONSTRUCTION MATERIALS REMAIN ON SITE PRIOR TO DISPOSAL. 2) CALL THE CITY OF TUCSON, DEVELOPMENT SERVICES, ENGINEERING SECTION (MIKE RUSSO 240-9859) TWO WEEKS PRIOR TO BUILDING OCCUPANCY DATE, SO A SITE INSPECTION CAN BE ACCOMPLISHED AND PUNCHLIST ITEMS CAN BE ADDRESSED PRIOR TO OCCUPANCY. 3) A FINAL GRADING INSPECTION FOR PERMIT # T05BU00010 MUST BE ACCOMPLISHED AND APPROVED PRIOR TO OCCUPANCY. 4) SWEEP UP ANY TRACKED MATERIAL OFF OF PUBLIC ROADWAYS AS NECESSARY. |
|
| 09/13/2005 | GRADING - FINAL | Not ready for Inspection | 1) ENSURE DRAINAGE ON NORTH SIDE OF PROPERTY MAKES IT TO CURB AND DOES NOT CROSS SIDEWALK 2) ADDITION OF PATIO WALLS TO UNITS, ENSURE WALLS OPENINGS AND SWALES ARE INSTALLED TO ALLOW FOR POSITIVE DRAINAGE AWAY FROM BLDGS. 3) BUILDER WANTS TO GET RID OF ONE PARKING SPOT TO GIVE EXTRA ROOM FOR PATIO. 4) BUILDER WANTS TO MOVE TRASH ENCLOSURE 20' TO THE EAST, MAY NOT BE ABLE TO DUE TO ENV. SERVICES ACCESS REQUIREMENTS. |