Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Basin - Fair
Inspection History: COT - BASN - Drainage/Basin - Annual Inspection - Recur
Plan Number - T05BA00220
Inspection Description - COT - BASN - Drainage/Basin - Annual Inspection - Recur
Inspection Status - Basin - Fair
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2017 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | MINOR TRASH, DEBRIS, AND WEEDS NEED TO BE REMOVED FROM WITHIN THE BASIN. | |
| 06/03/2016 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
| 03/25/2015 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
| 06/02/2014 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
| 06/21/2013 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
| 06/14/2012 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | BASIN IN GOOD CONDITION. MINOR AMOUNTS OF SEDIMENT AND VEGETATION HAS BEEN NOTED WITHIN THE BASIN LIMITS. A RE-INSPECTION OF THE SITE WILL BE PERFORMED WITHIN THE NEXT 6 MONTHS. | |
| 08/12/2010 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | Basin in good cond. | |
| 07/31/2008 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | Basin in good cond. | |
| 08/24/2022 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | Good | |
| 09/21/2021 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | Good | |
| 10/20/2020 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | Good. | |
| 11/18/2019 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
| 01/14/2019 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
| 02/23/2018 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
| 03/16/2023 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
| 07/25/2005 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | Pond is in good condition, there is a 3ft X 3ft grated outlet structure with a 6 inch bleeder pipe and a 24inch concrete pipe for overflow at the noth end. The structure was very clean. | |
| 01/10/2025 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | Basin is in good condition. | |
| 03/05/2024 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good |