Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: COT - BASN - Drainage/Basin - Condition Inspection
| Date |
Description |
Inspector |
Results |
Comments |
| 12/05/2007 |
COT - BASN - Drainage/Basin - Condition Inspection |
|
Passed |
Basin in good cond. |
| 01/06/2006 |
COT - BASN - Drainage/Basin - Condition Inspection |
|
Passed |
RECEIVED CERT MAIL RECEIPT. |
| 01/04/2006 |
COT - BASN - Drainage/Basin - Condition Inspection |
|
Re-inspection required |
was contacted by engineering firm who will begin cleanup of basin, I gave them an extension until 1/18/05. Phone number 622-4506 |
| 12/28/2005 |
COT - BASN - Drainage/Basin - Condition Inspection |
|
Re-inspection required |
3rd letter sent, requested all repairs made by 1/16/2006 or NOV will be issued. |
| 10/12/2005 |
COT - BASN - Drainage/Basin - Condition Inspection |
|
Re-inspection required |
2nd basin letter sent. |