| 06/15/2012 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
BASIN IN GOOD CONDITION. MINOR AMOUNTS OF SEDIMENT AND VEGETATION HAS BEEN NOTED WITHIN THE BASIN LIMITS. A RE-INSPECTION OF THE SITE WILL BE PERFORMED WITHIN THE NEXT 6 MONTHS. |
| 06/06/2011 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
Basin in good cond. |
| 04/16/2010 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Garbage and debris in basin |
| 12/13/2007 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Basin was cleaned however still has standing water in excess of 48 hours |
| 07/10/2006 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
Standing water in basin 48 hours after last rain, no coorctive measures have been taken on this project. Will send 2nd letter |
| 10/19/2005 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
NO CORRECTIVE MEASURES HAVE BEEN TAKEN BASIN STILL NEEDS REPAIRS |
| 09/09/2005 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
NO CORRECTIVE MEASURES HAVE BEEN TAKEN. |
| 08/17/2022 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
FAIR SOME OVERGROWTH |
| 08/16/2022 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
FAIR SOME OVERGROWTH |
| 03/18/2022 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
. Fair. Landscaping debris. Unmaintained |
| 10/18/2021 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
9170 DRAINAGE BASIN F NEEDS MAINTENANCE |
| 08/16/2021 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
POOR FULL OF WATER. |
| 08/16/2005 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
ENTIRE NORTHERN PART OF LARGE BASIN IS HOLDING APPROX. 5" (AT PERIMITER) OF WATER. INSPECTION AT 10:15 A.M. AFTER OVERNIGHT RAINFALL. |
| 03/17/2021 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Fair, Slightly overgrown with tree droppings. Not maintained at this time |
| 04/15/2020 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
|
| 04/30/2019 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
|
| 06/18/2018 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
|
| 06/13/2017 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
|
| 06/27/2016 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
|
| 03/23/2015 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
|
| 03/13/2014 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
|
| 08/29/2013 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
|
| 06/20/2013 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
|
| 02/16/2005 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Pond in fair cond. Silt and debris in bottom needs to be cleaned out. |
| 12/07/2022 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Basin is overgrown and not maintained. Business is vacant. |
| 01/16/2024 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
|
| 04/13/2023 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Overgrowth and landscaping debris |
| 10/13/2023 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
Excessively overgrown with trash and debris accumulation |
| 12/19/2024 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Beginning to accumulate excessive organic debris. |