Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Basin in Good Condition
Inspection History: DRAINAGE/BASIN INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 06/20/2016 |
DRAINAGE/BASIN INSPECTION |
|
Basin in Good Condition |
|
| 04/08/2015 |
DRAINAGE/BASIN INSPECTION |
|
Basin in Good Condition |
|
| 03/18/2015 |
DRAINAGE/BASIN INSPECTION |
|
Basin in Good Condition |
|
| 06/23/2014 |
DRAINAGE/BASIN INSPECTION |
|
Basin in Good Condition |
|
| 05/01/2013 |
DRAINAGE/BASIN INSPECTION |
|
Basin in Good Condition |
|
| 08/03/2010 |
DRAINAGE/BASIN INSPECTION |
|
Basin in Good Condition |
Basin in good cond. |
| 03/11/2008 |
DRAINAGE/BASIN INSPECTION |
|
Basin in Good Condition |
Basin in good cond. |
| 01/03/2005 |
DRAINAGE/BASIN INSPECTION |
|
Basin in Fair Condition |
FAIR. SOME SILT ACCUMULATION AND WEEDS. POND USES A 6" BLEEDER PIPE AT 2'-6" ABOVE POND BOTTOM. OVERFLOW IIS 6' ABOVE POND BOTTOM . RELEASES TO A 50"X40" GRATE. STRUCTURE WITH A 36" CMP OUTLET PIPE |