| 03/25/2016 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
TRASH ANDWEEDS. |
| 03/18/2015 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
OVER GROWN AND TRASH |
| 06/25/2014 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
MINOR WEEDS NOTED IN THE BASIN. |
| 06/11/2013 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
THRASH AND WEEDS NEEDS TO BE CLEANED AND REMOVED FROM ALL LOCATIONS WITHIN THE BASIN. |
| 05/15/2013 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
WEEDS IN THE BASIN NEED TO BE REMOVED |
| 06/12/2012 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
TRASH AND WEEDS. |
| 03/31/2011 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Remove the invasive weeds, grasses and plants from the basin. |
| 09/27/2022 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
POOR OVERGROWTH WITH GRASS TREES AND WEEDS |
| 07/27/2022 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
POOR OVERGROWTH WITH GRASS AND WEEDS. |
| 05/16/2022 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
POOR OVERGROWTH WITH GRASS AND WEEDS |
| 03/14/2022 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
POOR OVERGROWTH WITH GRASS, WEEDS. |
| 01/12/2022 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
POOR OVERGROWTH OF GRASS AND WEEDS |
| 11/10/2021 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
POOR OVERGROWTH OF WEEDS |
| 09/09/2021 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
DRAINAGE BASIN POOR OVERGROWTH AND TRASH |
| 12/16/2009 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
Basin in good cond. |
| 07/08/2021 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
POOR OVERGROWTH AND TRASH |
| 05/03/2021 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
POOR, OVERGROWTH AND TRASH |
| 12/01/2020 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Fair. Overgrown and not maintained |
| 06/29/2020 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Condition fair overgrown and not maintained. |
| 01/28/2020 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Overgrown and not maintained. |
| 08/30/2019 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Overgrown with garbage. |
| 04/30/2019 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
TRASH, DEBRIS, AND WEEDS HAVE BEEN NOTED IN, NEAR, OR ADJACENT TO THE BASIN AT THIS TIME. THIS MATERIAL WILL NEED TO BE CLEANED AND REMOVED FROM THE SITE PRIOR TO THE NEXT INSPECTION WITHIN 180 DAYS FROM THIS DATE. |
| 12/20/2018 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
some weeds and trimmings |
| 06/18/2018 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
MINOR TRASH, DEBRIS, WEEDS, AND SEDIMENT |
| 05/24/2017 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
BASIN OVER GROWN. |
| 12/16/2022 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Overgrowth and debris present |
| 12/28/2004 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
NO POND CONCRETE CHANNEL FROM STREET TO WASH. SMALL SUBDIVISON WITH NO RET/DET SYSTEM SCUPPERS FROM STREET CONVEY WATER TO CONC CHANNEL THAT CONVEYS TO WASH. |
| 03/27/2023 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
There’s some overgrowth of need of plants there. Address is 1826 West Mission Pl. |
| 04/10/2024 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
Basin has been inspected multiple times in the past month and is in poor condition the inlet area under sidewalk needs to be cleaned of debris and Mud the basin has sage brush, mesquite trees, trash and debris that need to be maintained. |
| 04/30/2024 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
The inlet to the basin is clogged up with overgrowth of grass and weeds |
| 05/07/2025 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
Basin has build up of sediment under sidewalk scupper and in inlet channel area. This channel is overgrown and filled with trash and evidence of dumping. At end of channel basin is dense with overgrowth. Basin is in need of being cleaned out to gain access and regain function. |
| 03/08/2024 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
Basin inlet from mission Pl is full of mud and debris and needs to be cleaned, basin is full of debris and trash and has overgrown trees and grass that need to be maintained. |
| 03/21/2024 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
No change since last inspection |
| 06/25/2024 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
inlet is severely impacted by debris, basin is overgrown and needs maintenance and dredging of sediment. |
| 07/02/2024 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
No changes from last inspection on 6/25 |
| 08/30/2024 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Poor |
This site was Inspected to be found in Poor Condition for the following reasons. Heavy areas of overgrown vegetation, weeds, and trees has been noted in the area before even walking in towards the basin. The entrance has approximately 2 inches of sediment in the inlet structure and vegetation has begun to grow as noted in the accompanying photos. Th main channel into the basin may have possibly 2 - 6 inches of sediment, trash, and debris that have accumulated over time. The entrance into the actual basin area is not evident due to the overgrown materials noted throughout this area. This basin and inlet structure needs to be cleaned and cleared of all excess vegetation, trash and debris needs to be done within the next 90 days. A re-inspection of this site will be performed on or before the end of February 2025. |
| 09/26/2023 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
some overgrowth with weeds and native plants |