Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Compliance
Inspection History: FOLLOW UP CODE VIOLATION
Case Number - T04VL00794
Inspection Description - FOLLOW UP CODE VIOLATION
Inspection Status - Compliance
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/09/2005 | FOLLOW UP CODE VIOLATION | Compliance | COMPLIANCE -- CLOSE CASE | |
08/01/2005 | FOLLOW UP CODE VIOLATION | Violation | VIOLATION - TUCSON CITY CODE 16-14-C 2,3,5,9 -- I SPOKE TO CONTRACTOR ON JULY 21, 2005. HE ADMITTED THAT HE KNEW REPAIRS WERE NOT PROPERLY MADE AND STATED THAT WORK WOULD BE DONE IMMEDIATELY AS OF TODAY, JULY 29, 2005 NO INSPECTIONS HAVE BEEN CALLED. REPAIRS NOT PER PLAN AND NOT PER DISCUSSION. N.O.V. PER SECTION 16-14-C -- LEFT W/MAINTENANCE. |
|
06/17/2005 | FOLLOW UP CODE VIOLATION | Violation | 6/16/05 -- OWNERS NEED TO FINALIZE THIS VIOLATION. IT IS OWNERS RESPONSIBILITY TO SCHEDULE AND HAVE INSPECTIONS APPROVED. PERMIT ACTIVITY #T04CM05629 HAS NEVER BEEN FINALED. LAST INSPECTION REQUEST SHOWS THAT NO PLANS OR PERMITS WERE PROVIDED TO INSPECTOR. NO FURTHER INSPECTIONS MADE. AS NO INSPECTIONS HAVE BEEN MADE - STRUCTURE IS IN VIOLATION OF C.O.T. N.P.O. 16-48 AND OWNERS ARE SUBJECT TO FINES OF $100.00 TO $2,500.00 PER DAY -- SITE MAINT. MGR. HAD PLANS ON SITE BUT REPAIR NOT MADE PER PLAN. F/U 30 DAYS |
|
05/02/2005 | FOLLOW UP CODE VIOLATION | Violation | 4/27/5 - A PERMIT WAS ISSUED BUT NO INSP EVER CALLED FOR - PROSECUTOR HAS DISMISSED CASE - SEND LETTER TO CALL FOR INSP. | |
03/11/2005 | FOLLOW UP CODE VIOLATION | Violation | 3/10/5 - PROPERTY OWNERS PROVIDED PROOF OF PERMITS TO PROSECUTOR AND THE CASE WAS DISMISSED. FU 60 DAYS | |
01/10/2005 | FOLLOW UP CODE VIOLATION | Violation | 12/30/05 - A CITATION WILL BE ISSUED FOR FAILURE TO OBTAIN PERMITS PROPERTY OWNERS ARE RESPONSIBLE FOR PERMITS REFER TO PROSECUTOR | |
12/17/2004 | FOLLOW UP CODE VIOLATION | Violation | 12/13/04 - SHADE STRUCTURE TEMPORARILY REPAIRED. A PERMIT WILL BE REQUIRED A) PROVIDE ENGINEERING DOCUMENTATION ALLOWING RE-USE OF COLD FORMED STEEL THAT HAS BEEN BENT OUT OF SHAPE AND THEN RE-BENT AND HAMMERED BACK INTO PLACE B) ANY CHANGE OF PURLIN SIZE OR FORM REQUIRES ENGINEERING APPROVED BY COT. C) INCLUDE ELECTRIC BRANCH CIRCUIT REPAIR ON PERMIT. - PULL PERMITS WITHIN 10 DAYS. |