Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Violation
Inspection History: INITIAL CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 11/05/2004 |
INITIAL CODE VIOLATION |
|
Violation |
WHOLE HOUSE DAMAGED - CONCENTRATED AT REAR ADDITION, PATIO COVER, ADDITION AT REAR, ENCLOSED PORCH AND KITCHEN WILL REQUIRE NEW ROOF, WALLS, SHEET ROCK AND SIDING. SMOKE DAMAGE TO ENTIRE STRUCTURE. ELECTRICAL DAMAGE IN ALL ROOMS, PLBG IN KIT AND BATH SUFFERED DAMAGE, ROOF TOP COOLER AND DUCTING DAMAGED. PERMITS REQUIRED FOR REBUILDING REAR PORTION OF HOUSE./ OWNERS PASSED AWAY AT HOSPITAL, SO BATHCREST CALLED TO BOARD UP. CONTRACTOR CALLED TO SECURE BLDGS. GAS AND ELEC CUT AT METERS. FU 15 DAYS TO CHECK IF BLDG SECURE. |