Inspection Status: Violation
Inspection History: INITIAL CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 04/22/2005 |
INITIAL CODE VIOLATION |
|
Violation |
COMBO PERMIT T04CM05277 ISSUED 3/4/05 PORCH ADDITION/ MECHANICAL ELECTRICAL UPGRADE TO 200 AMP PER VIOLATION. FILE MOTION TO DISMISS. COURT PAPERWORK SHOWS THAT MOTION WAS GRANTED ON 4/26/05 |
| 11/09/2004 |
INITIAL CODE VIOLATION |
|
Violation |
HOUSE IS POSSIBLY BEING REMODELED. FRONT ADDITION APPROX 12 X 20 WITH PORCH APPROX 6 X 15 ON SOUTHSIDE OF HOUSE. A NEW HEAT PUMP WITH ELEC AND MECH AND DUCT WORK NO PERMITS SEND NOV. |