Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Compliance
Inspection History: FOLLOW UP CODE VIOLATION
Case Number - T04VL00585
Inspection Description - FOLLOW UP CODE VIOLATION
Inspection Status - Compliance
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/27/2004 | FOLLOW UP CODE VIOLATION | Compliance | 12/20/04 - A PERMIT WAS ISSUED AND FINALED ON 12/08/04 (T04BU02897) CLOSE CASE FOR COMPLIANCE | |
11/16/2004 | FOLLOW UP CODE VIOLATION | Violation | CONTRACTOR CALLED, HE SAID HE WAS NOT AWARE THAT A PERMIT WAS REQUIRED. HE WAS INSTRUCTED TO COME TO DSD TO GET A GEN REPAIR PERMIT. FU 30 DAYS. | |
11/03/2004 | FOLLOW UP CODE VIOLATION | Violation | PERMIT IS NEEDED FOR REPLACMENT OF LOAD BEARING POST. REPAIRS WERE DONE BUT IT IS NOT CORRECT. |