Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case: T04VL00401

Parcel: 136345680


Addresses:

3450 S CHESIN DR

Inspection Status: Compliance

Inspection History: FOLLOW UP CODE VIOLATION

Date Description Inspector Results Comments
03/15/2005 FOLLOW UP CODE VIOLATION Compliance 3/11/5 - COMPLIANCE PERMIT WAS FINALED ON 2/3/5 - OK TO CLOSE CASE.
01/04/2005 FOLLOW UP CODE VIOLATION Violation 12/29/04 PERMIT WAS ISSUED ON 11/26/04 BUT NO INSP HAVE BEEN CALLED FOR. THE ADDITION WAS NEVER FINALED, SEND LETTER.
11/29/2004 FOLLOW UP CODE VIOLATION Violation INSP 11/26/04 - PERMIT # T04BU02874 ISSUED ON 11/26/04 FU 12/29/04
11/08/2004 FOLLOW UP CODE VIOLATION Violation SEND NOV PER STEVE LONG.
10/19/2004 FOLLOW UP CODE VIOLATION Violation OWNER, RUEBEN, WAS AT DSD LAST WK 10/14/04 - HE SPOKE WITH SUPERVISOR AND WAS TOLD HE NEEDED TO HAVE INSP DONE. 2 INSP WILL BE SENT TO INSP ADDITION PER ME RUBEN. THE FOAM IN ADDITION IS COMING APART. OWNER NEEDS TO REPLACE MATERIAL AND STUCCO IT. RUEBAN AGREED TO HAVE AN INSP SO HE CAN CONT NEXT WK. HE WAS TOLD BY J MALDONADO THAT WILL GET MORE INFO FROM SUPERVISOR TO VERIFY THAT HE WILL SEND AN INSP EVEN IF PERMIT FOR ADD HAS EXP.
10/19/2004 FOLLOW UP CODE VIOLATION Violation AN INSPECTION WAS CONDUCTED ON 10/18/04 OF THE STRUCUTRE. THE OWNER WAS PRESENT AND POINTED OUT WHERE A FIRE WAS STARTED BY THE PEST CONTROL CO TRYING TO GET RID OF BEES INSIDE THE STRUCTURE. A PROPANE FIRED SMOKE MACHINE WAS USED THE FOAM/TARPAPER AND A SECTION OF PLYWOOD CAUGHT ON FIRE, IT WAS QUICKLY CONTAINED BY TFD. THE WINDOW HAS TO BE REPLACED ALONG WITH THE FOAM AND TARPAPER. A SMALL SECTION OF PLAYWOOD WAS ALSO REPLACED. NO INTEROR DAMAGE OCCURED EXCEPT FOR A LITTLE CAULK AND PAINT. SEE PICTURES (NINE IN PACKET) AND A COPY OF INSP CARD FROM 1980. PERMIT WAS NEVER FINALED STEEL STUCCO MESH IS DETACHING FROM THE HOUSE. THE FOAM IS ALL DETERIORATING OR COMPLETELY GONE. ELECTRIC PANEL NOT SECURED AT THIS TIME.
10/01/2004 FOLLOW UP CODE VIOLATION Violation SPOKE WITH OWNER, HE NEEDS 10 MORE DAYS TO SUBMIT PROJECT - EXTENSION GRANTED.
08/17/2004 FOLLOW UP CODE VIOLATION Violation PLANS TO BE SUBMITTED WITHIN A WEEK. F.U. 30 DAYS.