Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 03/11/2005 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection :* |
| 12/30/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Partial Approval |
IVRS - Inspection :* FROM PRE FABRICATED RISER TO RISER ( ONLY ) 30 PSI TEST PARTIAL APPROVAL ?? ALL ITEMS US?. MAKE CORRECTIONS AND RETEST ENTIRE GAS SYSTEM. 1) CONNECT YARD LINE PIPING TO HOUSE PIPING AND TEST ENTIRE SYSTEM 10 PSI MINIMUN FOR 15 MINUTES WITH NO PRESSURE DROP AT TIME OF INSPECTION. 2) PIPING AT METER TO BE SCOTCH COAT WITH COUPLING PRIMOD & TAPE TO 6" ABOVE FINISH GRADE. 3) PROVIDE AGA OR CSA APPROVED GAS VALVE AT ALL APPLIANCES. 4) WATER HEATER CANNOT BE IN SLOOPING ROOM, PLEASE HAVE 03035 INTERMEDIATE ADDED TO YOUR PERMIT FOR WATER HEATER RELOCATION. 5) PROVIDE BONDING OF BUILDING GAS PIPING |