Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 01/04/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/PLEASE HAVE SOME ONE PRESENT AT TIME OF REINSPECTION 10:40AM | |
| 12/22/2004 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* | |
| 12/22/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/1)PROVIDE BONDING OF BUILDING GAS PIPING SYSTEM 2)PROVIDE CITY APPROVED DRAWING OF GAS SYSTEM WITH ADDITION OF FUTURE POSSIBLE GAS GRILL ON EXTERIOR. IF THIS IS NOT A FUTURE HAVE APPLIANCE INSTALLED. 03050-15 PSI TEST FROM NEW METER LOCATION 1" OVER HEAD TO EXIST BUILDING SERVICE ENTRY INCLUDING 1/2" VALVED & CAPPED FUTURE ON EXTERIOR WEST OF BUILDING. PARTIAL APPROVAL PENDING NOTES #1 & #2 |