Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/22/2004 | PLUMBING - FINAL | Approved | ||
| 12/21/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/1)PROVIDE BONDING OF BUILDING GAS PIPING 2)PROVIDE WATER HEATER TEMPERATE & PRESSURE RELIEF GRAVITY DRAIN TO DAYLIGHT 3)SEAL PENETRATION INTO BUILDING FOR GAS PIPING 4)PROVIDE VENT FROM WATER HEATER & FURNACE WITH APPROVED VENT CAP AND SHALL TERMINATE 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE. |