Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2004 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :*/15 PSI PRESSURE TEST TO POOL HEATER AND (2) ROOF TOP UNITS ONLY OK. CORRECTIONS MADE. GAS CARD AT METER SW GAS 889-1888 | |
| 12/21/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/1)REPLACE THREAD PROTECTOR WITH APPROVED COUPLING AT NORTH ROOF TOP UNIT. 2)SUPPORT PIPING AT CORRECT INTERVALS AT ROOF TOP UNITS 3)SUPPORT GAV PIPING AT POOL HEATER PROPERLY 4)POOL HEATER TEMPERATURE & PRESSURE RELIEF TO BE TERMINATED AT 6" - 24" AT DOWNWARD ANGLE TO PREVENT SLADING 5)BOTH PIPING SYSTEMS TO HOLD MINIMUM 10 PSI FOR 15 MINUTES 6)PROVIDE BONDING OF BUILDING GAS PIPING |