Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 01/19/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* ITEM #2 FROM PREVIOUS INSPECTION WAS NOT DONE |
|
| 12/17/2004 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :*/14 PSI AIR TEST NIW P.E. FROM METER TO EXISTING BUILDING SERVICE CONNECTION TO FURNACE & WATER HEATER OK PENDING (IF PIPING IS REROUTED RETEST SYSTEM) 1)SUPPLY CORRECT LENGTH & RATED FLEX FOR FURNACE 2)WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN TO GRAVITY DRAIN TO DAYLIGHT & TERMINATE WITH 90 DEGREE DOWN OR PROVIDE PETITION OF APPEAL SIGNED BY CITY ON SITE WITH CORRECT INSTALLATION. 3)PROVIDE BONDING OF BUILDING GAS PIPING. |