| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2004 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 12/03/2004 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 12/01/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/1)PROVIDE 10 PSI AIR TEST ON GAS SYSTEM AT TIME OF INSPECTION 2)PROVIDE AGA OR CSA APPROVED GAS VALVES AT ALL APPLIANCES. 3)REPLACE THREAD PROTECTOR ON ROOF GAS PIPING AT ROOF TOP UNIT. 4)PROVIDE BONDING OF BUILDING GAS PIPING. 5)PROVIDE WORKING TEMPERATURE & PRESSURE RELIEF VALVE ON WATER HEATER AND PROOF OF GRAVITY DRAIN TO DAYLIGHT OR SIGNED PETITION OF APPEAL ON SITE BY CITY WITH PROPER INSTALLATON 6)PROVIDE SUPPORT FOR ROOF TOP GAS PIPING. |