Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/17/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 12/06/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/ 1) 12 PSI TEST FROM NEW METER LOCATION ON EXISTING SERVICE ENTRANCE 10 WATER HEATER/FURNACE AND STOVE OK 2) PROVIDE DBL WALL VENT FOR WATER HEATER AND FURNACE AND TERMINATE WITH APPROVED VENT CAP |
|
| 11/29/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/1)PROVIDE 10 PSI AIR TEST ON ENTIRE GAS SYSTEM FOR MINIMUM 15 MINUTES WITH NO PRESSURE DROP. 2)PROVIDE AGA OR CSA APPROVED GAS VALVES AT ALL APPLIANCES 3)WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN TO RIDGID PIPE TO DAY LIGHT & TERMINATE AT 90 DEGREES DOWN 4)VENT FROM WATER HEATER & FURNACE WITON WITHIN 10' OF COOLER INTAKE TO BE 3' ABOVE TOP OF COOLER INTAKE 5)PROVIDE BONDING OF BUILDING GAS PIPING |