Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2004 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 11/18/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/1)TEST MUST BE ON ENTIRE GAS SYSTEM. INSTALL ALL FITTING AND TEST 10 PSI MINIMUM GAS SYSTEM IN ITS ENTIRITY. 2)GAS FLEX MAY NOT PASS THRU CABINET PARTITION. (HARD PIPE) AT OVEN. 3)WATER HEATER T&P DRAIN TO GO TO GRAVITY DRAIN TO DAYLIGHT OR PROVIDE PETITION OF APPEAL CITY SIGNED ON SITE WITH PROPER INSTALLATION 4)BONDING TO BE INSTALLED TO BUILDING COLD WATER PIPING |