Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESS TEST FNL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/08/2004 | PLUMBING - GAS PRESS TEST FNL | Approved | IVRS - Inspection :* | |
| 10/28/2004 | PLUMBING - GAS PRESS TEST FNL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/1)GAS SYSTEM TO HAVE MINIMUM 10 PSI ON TEST AT TIME OF INSPECTION. 8 PSI AT THIS TIME. 2)ALL UNDERGROUND PIPING FITTINGS TO BE PRIMEDT? TAPED AND SHALL BE APPROVED FITTINGS. THREAD PROTECTORS ARE NOT APPPROVED FITTINGS. INSPECTION STOPPED |
|
| 10/28/2004 | PLUMBING - GAS PRESS TEST FNL | Partial Approval | 1) SHALL PROVIDE TEST GAUGE WITH 1/10TH INCREMENTS. WITH 10 POUNDS MINIMUM OF TEST 2) SHALL STRAP DOWN EXISTING GAS LINES IN WATER HTR AND DRYER ROOM 3) SHALL EXTEND T & P DRAIN TO DAY LIGHT 4) SHALL SCREW DOWN WITH (3) SHEET METAL SCREWS AT WATER HTR FLU VENT THAT CONNECTS TO APPLIANCE COLLAR | |
| 10/26/2004 | PLUMBING - GAS PRESS TEST FNL | Not ready for Inspection | IVRS - Inspection :* |