Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 12/08/2004 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection :*/1)PRESSURE TEST APPROVED ON 11/16/04 2)CONNECTIONS AT METER OK 3)CONNECTION AT BBQ GRILL OK 4)NOW IT IS OK TO TURN ON THE GAS VALVE. ENJOY! |
| 11/15/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/1)GAS LILNE MAY NOT BE DIRECTLY EMBEDDED IN MASONRY OR CONCRETE 2)FLEX EXCEEDS ALLOWABLE LENGTH 3)FLEX CONNECTOR MAY NOT PASS THRU WALL OR PARTITION |
| 11/02/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/1)ALL MARRED SECTIONS TO BE TAPED. CONTRACTOR TO INSURE INSTALLATION 2)PRESSURE TEST OK. 3)OK TO COVER 4)MAKE ALL CONNECTIONS HOOK UP BBQ |