Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2004 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :*/ALL CORRECTIONS HAVE BEEN MADE | |
| 10/19/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/1)SHALL EXTEND & TERMINATE T&P DRAIN FOR WATER HTR TO DAYLIGHT. TERMINATE 6" ABOVE GRADE, USE C.P.V.C., COPPER OR GALVANIZED MATERIAL 2)SHALL PROVIDE A AGA OR CSA GAS SHUT OFF VALVE FOR WATER HTR 3)SHALL PROVIDE (3) SHEET METAL SCREWS PEE JOINT @ WATER HTR FLU VENT @ APPLIANCE COLLAR AND @ EACH JOINT 4)RE TEST SYSTEM |