Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2004 | PLUMBING - FINAL | Approved | IVRS - Inspection :*/CORRECTION MADE | |
| 10/19/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/15PSI AIR TEST FROM METER TO WATER HEATER STOVE AND WALL FURNACE OK IN BOTH NORTH & SOUTH UNITS 1)VENT FROM WALL FURNACE IN NORTH UNIT TO BE APPROVED DOUBLE WALL THRU ROOF TO POINT OF TERMINATION 2' ABOVE TOP OF COOLOR. THIS UNIT IS NOT TO USE WALL HEATER UNTIL VENT IS CORRECTED AND INSPECTED-CHARLES SPAGUE | |
| 10/18/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/SOUTH UNIT 20PSI AIR TEST FROM METER LOCATION TO STOVE, FURNACE, AND WATER HEATER OK 1)NORTH UNIT NEEDS TO HOLD AIR TEST. 2)NORTH UNIT WALL HEATER VENT TO BE 2' ABOVE TOP OF COOLER INTAKE | |
| 10/14/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 10/13/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |