Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2004 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 10/14/2004 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 10/13/2004 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) PTR LINE TO BE HARD PIPED TO EXTERIOR (UNSAFE) BLDG AND H20 HEATER 2) H20 HEATER FLUE PIPE INCORRECTLY INSTALLED (UNSAFE) 3) SECURE GAS PIPING TO WALL AT METER LOCATION AND AT ALL GAS APPLIANCES 4) SHUT-OFF TO APPLIANCES TO BE INSTALLED BEFORE FLEX CONNECTORS 5) ALL GAS VALVES TO BE ACCESSIBLE 6) GAS FLEX CONNECTORS ARE NOT TO BE RUN THRU FURNACE CABINET 7) SECURE GAS PIPE ON ROOF MAXIMUM 6' ON CENTER SPACING |