Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2004 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :*/15PSI TEST IS OK. LEFT GAS CARD | |
| 10/05/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/1)60LB PRESSURE GAUGE NOT ACCURATE. GAUGE CONNOT BE IN 1LB INCREMENTS, PLUMBING CODE CALLS FOR 1/10TH INCREMENTS. 2)T&P RELIEF VALVE OUTSIDE ON WATER PIPE MUST BE 125 PSI, NOT 150 PSI. SEAL APENINGS WHERE GAS LINE ENTERS THE BUILDING. PROVIDE PETITION OF APPEAL FOR ALTERNATE T&P DRAIN METHOD. RECALL FOR INSPECTION |
|
| 09/30/2004 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* COMPLETE YOUR WORK THEN CALL FOR INSPECTION | |
| 09/29/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/1)WHERE UNIONS ARE NECESSARY LEFT-RIGHT NIPPLES & COUPLINGS SHALL BE USED. 2)WATER HEATER TEMPERATURE & PRESSURE RELIEF SHALL GRAVITY DRAIN TO DAYLIGHT 3)ALL PIPING SHALL BE 6" MINIMUM ABOVE FINISH GRADE AND SEAL ENTRY INTO BUILDING. 4)SUPPORT PIPING WITH APPROVED METHEDS AND AT APPROPRIATE INTERVALS. 5)PROVIDE BONDING OF BUILDING GAS PIPING. |