Permit: T04PL01764

Parcel: 131052130


Addresses:

5402 E 30TH ST 0A


Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Permit Number - T04PL01764

Inspection Description - PLUMBING - GAS PRESSURE TEST

Inspection Status - Approved

Date Description Inspector Results Comments
10/06/2004 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*/15PSI TEST IS OK. LEFT GAS CARD
10/05/2004 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*/1)60LB PRESSURE GAUGE NOT ACCURATE. GAUGE CONNOT BE IN 1LB INCREMENTS, PLUMBING CODE CALLS FOR 1/10TH INCREMENTS. 2)T&P RELIEF VALVE OUTSIDE ON WATER PIPE MUST BE 125 PSI, NOT 150 PSI. SEAL APENINGS WHERE GAS LINE ENTERS THE BUILDING. PROVIDE PETITION OF APPEAL FOR ALTERNATE T&P DRAIN METHOD. RECALL FOR INSPECTION
09/30/2004 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :* COMPLETE YOUR WORK THEN CALL FOR INSPECTION
09/29/2004 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*/1)WHERE UNIONS ARE NECESSARY LEFT-RIGHT NIPPLES & COUPLINGS SHALL BE USED. 2)WATER HEATER TEMPERATURE & PRESSURE RELIEF SHALL GRAVITY DRAIN TO DAYLIGHT 3)ALL PIPING SHALL BE 6" MINIMUM ABOVE FINISH GRADE AND SEAL ENTRY INTO BUILDING. 4)SUPPORT PIPING WITH APPROVED METHEDS AND AT APPROPRIATE INTERVALS. 5)PROVIDE BONDING OF BUILDING GAS PIPING.