Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2004 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :*/1)ALL CORRECTIONS HAVE BEEN MADE | |
| 10/11/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/1)SHALL PROVIDE (3) SHEET METAL SCREWS PER JOINT @ WATER HTR FLU VENT APPLIANCE COLLAR AND @ EACH JOINT 2)SHALL RUN AND TERMINATE T&P DRAIN TO DAYLIGHT WITH PITCH AND TERMINATE 6" ABOVE CRADE. YOU MAY USE CPVC, COPPER OR GALVANIZED MATERIAL 3)SHALL TAPE PRIMER & WRAP 90DEGREES @ RISER 4)SHALL PROVIDE AGA OR CSA GAS SHUT OFF VALVES @ ALL APPLIANCES 5)RE TEST SYSTEM TO 10LBS MIN. |
|
| 10/05/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : 1) NO ONE HOME! |
|
| 10/01/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* |