Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2004 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 09/22/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/1)13 PSI TEST IS OK. 2)REPLACE OLD ASBESTOS VENT PIPE THRU ATTIC W/DOUBLE WALL PIPE INTO THE FURANCE CLOSET. 3)EXTEND ABOVE EVAP COOLER WITH AN APPROVED CAP. PROVIDE MIN 3 SCREWS IN JOINTS OF VENT CONNECTOR 4)PROVIDE HIGH COMBUSTIN AIR TO WATER HEATER ENCLOSURE NIN. 100 SQ IN. 5)GAS PRESSURE TEST OK 6)OK TO BACKFILL TRENCH |