Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/21/2004 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/17/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) NO ANSWER AT DOOR 2) NO ACCESS 3) RECALL |
|
| 10/07/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/10 PSI TEST IS OK. OK TO BACK FILL TRENCH. PROVIDE MIN. 1" CLEARANCE TO COMBUSTIBLES ON WATER HEATER VENT. PROVIDE AN APPROAVED CAP ON WATER HEATER VENT. PRIME & TAPE BARE SPOT ON GAS PIPE AT GRADE. EVERYTHING IN HOUSE IS OK. RECALL FOR INSPECTION. |
|
| 09/30/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE BONDING UNDER ALL UNDERGROUND PIPING. 2) 10 PSI TEST SHALL BE IN PLACE AT TIME OF INSPECTION. 3) WATER HEATER T &P DRAIN TO TERMINATE DOWNWARD. 4) PROVIDE3 UPPER & LOWER COMBUSTION AIR FOR WATER HEATER. 5) PROVIDE ROOF FLASHING WHERE PIPE PENETRATES ROOF. 6) VENT FROM FURNACE TO BE 2' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER. |