Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 09/22/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection :* |
| 09/20/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection :*/1)FITTING AT CONNECTION BETWEEN SCOTCH COAT & BLK PIPE AT METER IS A THREAD PROTECTOR AND NEEDS TO BE REPLACED WITH AN APPROVED COUPLING. 2)PLEASE PRIME & TAPE ALL UNDERGROUND PIPE WITH TOOL MARKS AND FITTINGS 3)WATER HEATER TEMPERATURE PRESSURE RELIEF TO BE OPENABLE AND CRAVITY DRAIN TO DAYLIGHT. 4)ALL APPLIANCES TO HAVE APPROVED AGA OR CSA GAS VALVES 5)ROOF TOP UNIT REQUIRES APPROVED GAS VALVE AND THEN FLEX CONNECTION TO UNIT 6)PROVIDE BONDING OF BUILDING GAS PIPING |
| 09/17/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection :* |