Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 09/22/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection :* |
| 09/20/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection :*/1)ALL ABOVE GROUND PIPING TO BE 6" MINIMUM ABOVE FLUSH? GRADE 2)WALL HEATER VENT TO BE 2' ABOVE TOP OF COOLER WITHINWITON? WITHIN 10' OF INTAKE 3)OBTAIN PERMIT FOR WATER HEATER 4)EXPOSED PIPING SIENCE? BE INSULATED TO STOP POSSIBLE PROOFING?. 5)PROVING BONDING OF BUILDING GAS PIPING |