Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/1)10 PSI AIR TEST SHALL BE ON ENTIRE GAS SYSTEM AT TIME OF INSPECTION. 2)UNDERGROUND PIPING SHALL BE SCOTCH COATED AND ALL TOOL MARKS & FITTINGS SHALL BE PRIMED & TAPED WITH 10 MIL TAPE 3)ABOVE GROUND PIPING SHALL BE 6" MINIMUM ABOVE FINISH GRADE 4)WHERE UNIONS ARE NECESSARY LEFT & RIGHT NIPPLES & COUPLINGS SHALL BE USED. 5)AGA OR CSA APPROVED GAS VALVES SHALL BE USED AT ALL APPLIANACES AND IF WANTED AT BUILDING SERVICE ENTRANCE 6)APPROVED COUPLINGS SHALL BE USED. THREAD PROTECTORS ARE NOT APPROVED COUPLINGS 7)VENT FROM WATER HEATER TO BE PROPERLY CONNECTED WITH 3-GALV SCREWS AT EACH JOINT AND BE DOUBLE WALL THRU ROOF WITH 1" MINIMUM GAP FROM COMBUSTABLES, WITH APPROVED FLASHING, AND TERMINATE WITH APPROVED CAP 8)BUILDING GAS PIPING TO BE BONDED 9)VENT FROM WALL HEATER TO BE 2' ABOVE TOP OF COOLER WHEN WITHIN 10' OF COOLER INTAKE |