Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T04PL01646

Parcel: 130071870


Addresses:

3757 E 25TH ST

Inspection Status: Denied

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
10/26/2004 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*/1)10 PSI AIR TEST SHALL BE ON ENTIRE GAS SYSTEM AT TIME OF INSPECTION. 2)UNDERGROUND PIPING SHALL BE SCOTCH COATED AND ALL TOOL MARKS & FITTINGS SHALL BE PRIMED & TAPED WITH 10 MIL TAPE 3)ABOVE GROUND PIPING SHALL BE 6" MINIMUM ABOVE FINISH GRADE 4)WHERE UNIONS ARE NECESSARY LEFT & RIGHT NIPPLES & COUPLINGS SHALL BE USED. 5)AGA OR CSA APPROVED GAS VALVES SHALL BE USED AT ALL APPLIANACES AND IF WANTED AT BUILDING SERVICE ENTRANCE 6)APPROVED COUPLINGS SHALL BE USED. THREAD PROTECTORS ARE NOT APPROVED COUPLINGS 7)VENT FROM WATER HEATER TO BE PROPERLY CONNECTED WITH 3-GALV SCREWS AT EACH JOINT AND BE DOUBLE WALL THRU ROOF WITH 1" MINIMUM GAP FROM COMBUSTABLES, WITH APPROVED FLASHING, AND TERMINATE WITH APPROVED CAP 8)BUILDING GAS PIPING TO BE BONDED 9)VENT FROM WALL HEATER TO BE 2' ABOVE TOP OF COOLER WHEN WITHIN 10' OF COOLER INTAKE