Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2004 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) GAS PRESSURE TEST IS OK 2) ALL CORRECTIONS HAVE BEEN MADE 3) OK TO BACKFILL TRENCH | |
| 09/14/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection : 1) SHALL PROVIDE AIR PRESSURE TEST ON ENTIRE EXSISTING SYSTEM 10LBS MIN. 2) SHALL CONNECT AND EXTEND WATER HTR FLU VENT MIN OF 5' IN LENGTH WITH CAP AND USE (3) SHEET METAL SCREWS PER JOINT AND @ APPLIANCE COLLAR. 3) WATER HTR FLU VENT REQUIRES MIN OF 1" CLEARANCE FOR DBL SINGLE WALL FROM COMBUSTIONABLE MATERIAL. 4) SHALL REPLACE T & P VALVE @ WATER HTR. 5) SHALL RELACE GAS SHUT OFF VALVE W/APPROVED AGA OR CSA VALVE. |